1 / 10

2006 Beam Use Request

STAR. 2006 Beam Use Request. Renee Fatemi RHIC SPIN Meeting October 5th 2005. More protons please!. Heavy Ion Community Analysis for Run4/5 Au-Au/Cu-Cu data is ongoing Accelerator Goals for Heavy Ion Program generally achieved Upgrades necessary for large portion of future programs

Download Presentation

2006 Beam Use Request

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STAR 2006 Beam Use Request Renee Fatemi RHIC SPIN Meeting October 5th 2005

  2. More protons please! • Heavy Ion Community • Analysis for Run4/5 Au-Au/Cu-Cu data is ongoing • Accelerator Goals for Heavy Ion Program generally achieved • Upgrades necessary for large portion of future programs • Spin Community • Run3/Run4 preliminary Jet results released ! Run 4 preliminary Lambda results released! Run3 final and Run 5 preliminary forward 0 results released! • Taken <5% of necessary 275 pb-1 needed for STAR spin goals at √s = 200 GeV • Need x7 increase in Run 6 FOM compared to Run 5 to statistically differentiate between standard and zero gluon polarization scenarios • Yearly pp running time is necessary to develop ultimate luminosity/polarization requirements • Several hardware improvements make this time optimal for pp run

  3. Use CAD projections of Max/Min luminosity for 24 weeks of running to set delivered luminosity expectation = 90 pb-1 which translates into 30 pb-1 sampled at STAR. Running time split 2/1 between longitudinal/transverse.

  4. Transverse Spin Running Goals • Forward Physics with FPD++ • Precision 0 AN in x_F and p_T • Expanded acceptance allows detection of “jet-like” events (di-0 or +0) which can be used to separate Collins/Sivers contribution to 0 AN • New configuration allows detection of 2nd  from 0 providing opportunity to start /0 discrimination algorithms

  5. Mid-Rapidity Di-jet AN Vogelsang/Boer • Di-jet AN of deviation from back-to-back provides leading twist access to Sivers Functions. • Completion of BEMC maximizes statistical precision (not reflected in plot) • Shielding installed this summer provides crucial out of plane background reduction Level II triggers should lead to 50% enhancement in lower energy di-jet stats

  6. { Inclusive 0 Inclusive jet develop algos Longitudinal Running Goals 2004/2005 0 analysis in progress for forward & mid-rapidity regions 1<<2 1<<2 0<<1 Projections don’t include increase in trigger efficiency due to level II trigger + shielding

  7. Continue Inclusive Jet ALL and X-sec for mid-rapidity 2005 2006 Start collecting di-jet sample + developing necessary  - 0 discrimination algorithms for future direct photon and +jet measurements.

  8. Important 2006 STAR Hardware Upgrades • FPD++ - reconfiguration of Pb-Glass around FPD on west side allows for Sivers/Collins separation • Iron Shielding implemented this summer will improve STAR trigger efficiency and uptime,provide crucial out of plane shielding for di-jet Sivers measurement, as well as reduce systematic errors on inclusive jet/0 measurements • Complete readout for Barrel EMC Detector -- double di-jet reconstruction efficiency and total # mid-rapidity jets and 0 • L2 trigger Algorithms being developed to enhance di-jet//0 samples

  9. STAR Official Request and Time Schedule • STAR Collaboration strongly supports all pp RUN6 • STAR estimates 90/30 pb-1 delivered/sampled • 2 weeks cool down + 2 weeks CAD ramp up +1 week STAR trigger/detector calibration • 19 weeks PHYSICS running resulting in 10/20 pb-1 transverse/longitudinal sampled • Interested in devoting a few days to higher energy beam tests • Request for Jet Target run concurrently with CNI • If pp goals are met early STAR would request AuAu at injection or lower energy for elliptic flow studies/comparisons with SPS

More Related