NERC IRO-001 RC Authority, Coordination

NERC. Possible Future for TLR and Congestion Management

hart
Download Presentation

NERC IRO-001 RC Authority, Coordination

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERC Possible Future for TLR and Congestion Management NAES would adopt and re-write the TLR procedure. Working with FERC, they would create a new attachment to the tariff for congestion management. The TLR procedure would become the pro-forma requirement, and would be written such that a provider could simply cut and paste it into their tariff if they wished. WECC could write a similar “cut and paste” procedure (USF). NERC would modify IRO-001 to require a section on congestion management in the Regional Reliability Plan. In that plan, the Region would need to specify 1.) the detailed CM procedures used by each of its TSPs, 2.) how any CM difference between the TSPS within the region are addressed, and 3.) how any CM differences with other regions are addressed. This incentivizes the region to have CM practice, and to reduce operational seams where possible. NERC would approve the plan based on the reliability aspects only. NERC IRO-001 RC Authority, Coordination NERC IRO-005 Monitor and Analyze NERC IRO-006 Identify and Order Corrective Action Provider Tariffs and Market Rules (regulator approved – US CDN, or State) Reliability Here FERC Attachment x Congestion Management Regional Reliability Plan (NERC Approved) Equity Here Intra-Regional Coordination Procedures CM Attachment for each TSP FERC Pro-Forma CM Attachment for each TSP CM Attachment for each TSP Choose One (or modify one or write your own) Inter-Regional Coordination Procedures Attachment x Congestion Management ERCOT CM Procedure Detailed procedure (NERC pre-approved, may be regulator pre- approved also) WECC USF Procedure Detailed procedure (NERC pre-approved, may be regulator pre- approved also) NAESB TLR Procedure Detailed procedure (NERC pre-approved, may be regulator pre- approved also) The Regional Reliability Plan CM Attachments describe the CM procedures for each TSP. The could be cut and pasted form the TSPs tariff, or (in the case of ERCOT or other non-jurisdictional) be a standalone document. Entities with other CM procedures, ERCOT WECC NAESB

More Related