Priorit at i de investitii in infrastructura

Priorit at i de investitii in infrastructura. Aceeasi problema , vazuta in ani diferiti – criza economica a salvat sistemul electroenergetic de la un colaps. Integra rea productiei eoliene in curba productiei August 2012. 1.382 MW, eolian ( 28 August 2012 ).

hasad
Download Presentation

Priorit at i de investitii in infrastructura

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prioritati de investitii in infrastructura

  2. Aceeasiproblema, vazuta in anidiferiti– crizaeconomica a salvatsistemulelectroenergetic de la un colaps

  3. Integrarea productieieoliene in curba productieiAugust 2012 1.382 MW, eolian (28August 2012) Sursa: Transelectrica

  4. Integrarea productiei eoliene in curba productieiDecembrie 2012 1.349MW, eolian (2 Decembrie 2012) Sursa: Transelectrica

  5. Integrarea productiei eoliene in curba productieiAprilie 2013 1.828MW, eolian (15 Aprilie 2013) Sursa: Transelectrica

  6. Integrarea productiei eoliene in curba productieiMai 2013 766MW, eolian (6 Mai 2013) Sursa: Transelectrica

  7. CurbaproductieiMai 2013 378MW, carbune (7 Mai 2013) Sursa: Transelectrica

  8. Productia de electricitate in 2012 – Raport Anual ANRE

  9. Concentrarea pietei de electricitate in 2012

  10. Cum se tranzactioneaza electricitatea angro in Romania?