1 / 7

Current Status of FT and planning for 2003

Current Status of FT and planning for 2003. WP4 Workshop 10.12.2002 – 13.12.2002 CERN,Geneva. Current Status of FT. FT engine reads out simple XML based rule files Development of the configuration GUI via web has started and is usable Connection to the Monitoring is done

hea
Download Presentation

Current Status of FT and planning for 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Current Status of FT and planning for 2003 WP4 Workshop 10.12.2002 – 13.12.2002 CERN,Geneva Lord Hess WP4 Workshop 10.12 – 13.12.2002

  2. Current Status of FT • FT engine reads out simple XML based rule files • Development of the configuration GUI via web has started and is usable • Connection to the Monitoring is done • Development of the reporting protocol to the monitoring has not started Lord Hess WP4 Workshop 10.12 – 13.12.2002

  3. Sensors • Sensors are provided by the monitoring system • FT is able to handle return values from metrics of type „integer“ Lord Hess WP4 Workshop 10.12 – 13.12.2002

  4. Actuators • There is no special API needed to plug in actuators • Perl-, PHP-, bash-, c-shell-scripts or normal executable binaries will work. • You can use all standard commands as an actuator, like „tar“ or „rm“ Lord Hess WP4 Workshop 10.12 – 13.12.2002

  5. Reporting to Monitoring • At this moment we are using the tail sensor from the monitoring to report actions taking. • We have decided to report not only actions, but also the results of the rule evaluated. Lord Hess WP4 Workshop 10.12 – 13.12.2002

  6. GUI • Web based GUI with access control and MYSQL • This GUI must have an interface to the Configuration Dababase (not done yet) • First Draft of an XSLT file for presenting the rules on the web is done, but is not very powerful Lord Hess WP4 Workshop 10.12 – 13.12.2002

  7. Deliveries for 2003 Lord Hess WP4 Workshop 10.12 – 13.12.2002

More Related