An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CATHIMarie Curie Initial Training NetworkCryogenics, Accelerators and Targets at HIE-ISOLDE Andrey Shornikov WP8, ER3 Mid Term Review Meeting, 26 September 2012

  2. Outline • Background; • Activity at CERN; • Project status and achievement; • Experience in the project; • Conclusions;

  3. Background PhD at university of Heidelberg/MPIK (DE)

  4. Activity at CERN WP8: Radioactive Ion Beam Quality Improvement / ER3:Charge breeder design study • Simulations of high current space charge limited electron beam for HIE-EBIS; • Simulation based design of High Energy Current and Compression (HEC2) electron gun, drift tubes, High Power Collector (HPC) and spec for the magnetic system; • General design concept of the HIE-EBIS;

  5. Project status and achievements after 3 months Active knowledge transfer: • Visited best performing relevant EBIT/S groups at MPIK, BNL, MSU/NSCL. • Preliminary agreement on collaborative construction of the HEC2 gun with BNL, getting approval at CERN. If approved and funded the gun can be built and tested within the 2 years WP*. • HIE-EBIS wide board workshop** with attendance of 28 on 16-17.10 to discuss the options and get feedback from CERN and external experts • * Goes beyond WP **CATHI sponsored

  6. Project status and achievements after 3 months

  7. Outlook and options • The gun HEC2 will be built and experimentally tested at BNL EBTS facility * • HPC and drift tube structure will be designed adopting BNL/ANL scheme to a detailed phase. • Simulation based specs for the magnet and general design concept of the HIE-EBIS will be elaborated • The HEC2 gun will be modeled and designed • HPC and the drift tube structure will be simulated and designed to the first order. • Simulation based specs for the magnet and general design concept of the HIE-EBIS will be elaborated VS.

  8. Experience in the project Trainings and personal development • Learning from best performing EBIT/S groups • Intensive training in COMSOL to utilize multiphysics approach in design (Sep 12) • CERN Accelerator School to extend accelerator physics background (Oct 12)

  9. Conclusion Keeping up with the plan • Trainings: according to the CDP (COMSOL taken, CAS – registered Oct, French - registered Oct) • Milestones: M41 first one to be delivered by mid October (HIE-EBIS WS) • Deliverables: according to the plan • Meetings (CERN TE-MSC, TE-VSC, MPIK), secondments (BNL, MSU/NSCL) : according to the CDP. • Conferences: EMIS 2012 registered according to the CDP. • Networking/collaboration: if approved the HEC2 collaboration with BNL profits both the ER3 and the HIE-EBIS project by more effective use of resources, saving time, working with and learning from the best specialists using the unique facility.