1 / 8

INC Report to the NANC May 2002 David Bench - INC Moderator

INC Report to the NANC May 2002 David Bench - INC Moderator Rose Travers - INC Assistant Moderator. INC MEETINGS. June 3-7, 2002: INC 64 Portland, OR July 29-August 2, 2002: Montreal, Quebec, Canada September 9-13, 2002: Providence, RI All meeting information can be found at:

helen
Download Presentation

INC Report to the NANC May 2002 David Bench - INC Moderator

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INC Report to the NANCMay 2002David Bench - INC Moderator Rose Travers - INC Assistant Moderator

  2. INC MEETINGS • June 3-7, 2002: INC 64 Portland, OR • July 29-August 2, 2002: Montreal, Quebec, Canada • September 9-13, 2002: Providence, RI • All meeting information can be found at: www.atis.org/atis/clc/inc/inccal.htm

  3. RELEVANT INC WEB SITES • INC Homepage: http://www.atis.org/atis/clc/inc/inchom.htm • INC Calendar: http://www.atis.org/atis/clc/inc/inccal.htm • INC Issues: http://www.atis.org/atis/clc/inc/incissue.htm • INC Meeting Records: http://www.atis.org/atis/clc/inc/incmtgrc.htm • INC Published Documents: http://www.atis.org/atis/clc/inc/incdocs.htm

  4. LNPA WORKSHOP • PA contract inhibits timely changes to process improvements and is inflexible relative to the change order process • The PA contract is based on the INC Guidelines/Forms in effect on Sept. 9, 2000. • For example, the ability to add a “remarks” field on PAS mechanized forms is hampered by the change order process • INC and PA continue to improve industry processes • Some PAS upgrades require additional funding, such as adding a “remarks” field • Frustration with implementing current change orders in PAS because state trial processes were more flexible

  5. CO/NXX WORKSHOP • INC discussed at length the input received from state regulators on Issue 322 - Removal of Switch ID. Although the issue remains in initial closure, INC has concluded that the Switch ID field should be removed because: • FCC rules mandate assignments at the rate center level, not the switch level; • Switch ID is an artifact from the days when assignments were made at the switch level and is no longer used in the assignment of a Central Office code; • SPs may move numbers between switches within a rate center to balance resources, therefore rendering the original Switch ID moot; and • State regulators have other ways to obtain Switch ID information, e.g., TRA, CCMI, NECA FCC Tariff No. 4 and other vendor products.

  6. CO/NXX WORKSHOP • NANC LNPA Working Group provided further clarification relative to PIMs 14 & 15 which the INC is working within Issue 364 - Modifications to Procedures for Code Holders/LERG Assignee Exit • INC approved interim procedures for returning non-pooled codes with active or pending TNs (detailed in the NANPA report)

  7. NANPE Workshop • NANP Expansion Reference Document • Final Closure expected at July INC meeting • July NANC meeting precedes July INC meeting • NANC briefing on Reference Document in September • INC requests NANC members submit questions, in writing, prior to September meeting.

  8. INC Issue Summary

More Related