Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS W GISS-15

Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS W GISS-15 May 2003 Toulouse, France. Background. September 2001 proposal via WGCV (Yves-Louis Desnos) WGISS-13 Discussions (Peter Churchill) Spring of 2002 – USGS agrees to sponsor a WTF

Download Presentation

Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS W GISS-15

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15 May 2003 Toulouse, France

  2. Background • September 2001 proposal via WGCV (Yves-Louis Desnos) • WGISS-13 Discussions (Peter Churchill) • Spring of 2002 – USGS agrees to sponsor a WTF • The WTF plan discussed at … • WGCV Ottawa Meeting (May 2002) • WGISS Frascati Subgroup (May 2002) • WGISS Alexandria Subgroup (Sept. 2002) • The WGCV/WGISS WTF plan approved 15 October 2002 • edcsgs16.cr.usgs.gov/wgiss/ • username = calval99 password = wgiss03

  3. Objectives ·   * Establish linkages between site data archives to facilitate improved product access and knowledge assessments of the long-term stability and interoperability to address the challenges of the Terrestrial Carbon Observation (TCO) theme. * Ramp-up validation efforts, leveraging off of the infrastructure and protocols developed through existing site activities, ·   * Address science questions suitable for combined field and multi-resolution data. ·   * Enable ready collaboration between validation investigators and existing science networks and programs. ·   *Facilitate validation activities directed at better product knowledge and assessment of the products’ stability and interoperability.

  4. Goals: Phase I • Simple, Web-Based Interface Over CEOS Core Sites • Allow Users to Specify Conversion Parameters • Provide Access to EO and in-situ Data • Begin With MODIS & Landsat • Allow Reprojecting • Allow Reformatting into GeoTIFF

  5. Goals Phase II ·       Incorporate GTOS “Terrestrial Ecosystem Monitoring Sites” ·       Add CEOP/NASDA, CSIRO, GT-net, ILTERS as Phase II efforts ·      Enable synergy within and between Satellite/Sensor science teams for data collection and subsequent research ·       Provide science community with immediate, easily accessible data from CEOS member sensors ·       Provide a focus for ongoing satellite, aircraft, and ground data collection for validation of CEOS member satellite/sensor products ·       Provide scientists with sets of readily accessible in-situ and CEOS member instrument data for algorithm validation and improvement ·       Build on infrastructure of existing scientific networks and validation sites ·       Realize international cost-sharing opportunities

  6. The WGCV/WGISS WTF

  7. The WGCV/WGISS WTF

  8. The WGCV/WGISS WTF

  9. The WGCV/WGISS WTF

  10. The WGCV/WGISS WTF

  11. The WGCV/WGISS WTF

  12. The WGCV/WGISS WTF Email Notification for User: EMAIL:

  13. Re-Projection Tool Results Boreas Test Site MODIS Data in Sinusoidal Projection Boreas MODIS re-projected from Sinusoidal to Universal Transverse Mercator

  14. NAMING CONVENTIONS: DATA SET NAMES MOD09A1 MODIS/Terra Surface Reflectance 8-Day L3 Global 500m ISIN Grid Grid or not ShortName Instrument Spatial Resolution Platform Global or Swath Parameter Processing Level Temporal Resolution

  15. NAMING CONVENTIONS: FILE NAMES MOD09A1.A2000185.h11v05.003.2000193081710.hdf Julian Processing Data Year, Day, Hour, Minute, Seconds ShortName TileID Julian Acquisition Date Processing Version

  16. Summary • Close to Phase 1 Completion • SPOT Requirements Creep for Vegetation Accommodated • WGCV Happy With Results • CEOS Plenary Demo Planned • November 2003 • Phase II Requirements Captured • June 2003