Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #34 Plenary DCL Trials Update 07/17/2014 Matt Maki KEWR, KMEM DCL Trials Lead
DTAP Build 7.2 Status Update • Build 7.2 Full Climb Via SID Compliance: • Compliance with full 7110.113 CVS Changes • CVS, CVS Except Maintain, Maintain ALT Selections • Arrival/Departure Processing, FD Response to AOC • MEM/EWR ATC conducting B7.2 ATC training (Harris training sheet) • 7/14 Build 7.2.1 Installed at FAATC (PTR #193, 199, 200) • Proposed Build 7.2 Schedule: • June 25: B7.2 FAT at Thales • June 26: Install/SAT at FAATC • June 27 - July 24:Testing at FAATC • July 24: MEM/EWR Install Decision Point • July 28-30: Install/SAT at KMEM and KEWR (KEWR install starts on July 29)
KEWR DCL Trials Status Update • UAL Update: • Minimum B767 DCL ops completed (6/17-20) • UAL POI formally approved full fleet daily B767, B757 KEWR DCL Ops • Aug 1 start estimate (FAA DC PO request to move date up) • 30-45 new daily B767/B757 DCL Ops expected • Daily B777 Ops continue • UPS, FDX Update: • Continued Daily MD-11, B767 Ops • International Participation Update: • BAW Pilot Training materials sent to NY IFO (Approval Pending) • BAW ready to resume DCL operations (B777/B787)
KEWR DCL Trials Status Update • Planned Print/TV Media Day following SWAP season • Continued outreach with ZNY TMU for implementing Route Structure rules: • Agreement in place with ZNY on Field 6 marking (KEWR) • Meeting scheduled at ZNY on July 24 • July 3 SWAP Measureable DCL Benefits: - Expedited OFF
KMEM DCL Trials Update • FDX Daily DCL Ops Ongoing: • DTAP Processing 20-40 FDX DCL ops per push • SWAP/Route Revision Benefits (FDX evaluation) • Expanded use of UM79 - Runway Re-Balancing (FDX Tactical) • Final KMEM HADDS, FDIO Test NCP Extensions Approved by NAS CCB (7/14): • Each extended until Trials end (Jan, 2016) • KEWR NCPs will be extended next April
Questions ? KUSA