HBD Elec racks available. HBD gas sys available. Proposed Schedule for the Start of Run-6. PHENIX Schedule for Fall 2005. PHENIX Detector Maintenance. EC hook-up, Blue sheet. East Carriage Roll-in. PHENIX Ready. Module Prep. TOF Final Assembly & Test. TOF Tests in IR. TOF Modules
E N D
HBD Elec racks available HBD gas sys available Proposed Schedule for the Start of Run-6 PHENIX Schedule for Fall 2005 PHENIX Detector Maintenance EC hook-up, Blue sheet East Carriage Roll-in PHENIX Ready Module Prep TOF Final Assembly & Test TOF Tests in IR TOF Modules at BNL TOF preamps available TOF install in IR Tests with HBD prototype HBDp Tests in 1008 HBD Gas sys Commissioning HBD Preamps available HBDp Tests in IR HBDp Install in IR RHIC Cryo Start First Collisions