The new German Renewable Energy Sources Act (EEG) - new advanced regulation for grid extension, grid integration and feed-in management Hermann Albers German WindEnergy Association (BWE) EWEC 2009 Marseille, France. German wind energy market - Overview on the current situation…

holly-moore
Download Presentation

German wind energy market - Overview on the current situation… … and prospects until 2020

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The new German Renewable Energy Sources Act (EEG) - new advanced regulation for grid extension, grid integration and feed-in management Hermann Albers German WindEnergy Association (BWE) EWEC 2009 Marseille, France

  2. German wind energy market - Overview on the current situation… … and prospects until 2020

  3. Wind energy in Germany end 2008 Source: DEWI/BWE, 2009

  4. 2020: wind power will cover 25 % of gross electricity consumption

  5. 2020 Electricity mix – Renewables secure 47% of supply

  6. The German Renewable Energy Sources Act (EEG) – Amendments from 1st January 2009 …good basis for achieving targets

  7. EEG 2009: Higher Remuneration for new turbines onshore and offshore since 1rst January 2009, lower rate of degression

  8. EEG 2009: Recompensation onshore wind – additional boni • Additional bonus for improved grid compatibility - SDL • Bonus for new turbines: 0.5 ct/kWh on top of the initial remuneration; old turbines: 0.7 ct/kWh for limited period • Repowering : Bonus payable on top of the initial remuneration • amounting to 0.50 ct/kWh • First step remuneration • Basic remuneration

  9. EEG 2009: Grid extension and optimisation New rules for curtailment Grid extension and losses NEW: Grid operators are not only obliged to extend the grid, but also to optimise and enhance the existing grid. NEW: Failure to comply can lead to claims for losses by anyone willing (but unable) to feed in. (§ 9, § 10) Curtailment NEW: Turbines need to be equipped for remote reduction of supply and monitoring of actual supply (1/4-h). NEW: Grid operators pay financial compensation based on agreements. NEW: Grid operators are charged with optimising feed-in management.

  10. EEG 2009: Direct marketing and improved integration through system integration bonus NEW: Direct marketing: §17Entry and exit on a monthly basis NEW: Decree to be completed on system integration Additional information: www.eeg-aktuell.de

  11. What else is needed Commissioning of new sites and administrative barriers – Federal States and regional planning authorities to improve framework conditions

  12. Regional planning: commissioning of new sites needed for new and for repowering capacity Example of Federal State of Brandenburg: New „Energy Strategy 2020“: Current capacity: 3,767 MW (end 2008) Capacity 2020: 7,500 MW = about 55 PJ wind electricity until 2020 Planning for new sites for wind energy development: Today: 371 sqkm 2020: 555 sqkm = increase of 50 %!

  13. Efficiency: Federal States to reconsider distanceregulations and hightrestrictions Coastal site:

  14. The future: smart grid development Up to 2 Mio. carsuntil 2020

  15. Hermann Albers PresidentGerman WindEnergy Association (BWE) Marienstraße 19-20 D - 10117 Berlin Tel.: +49 / (0)30 - 28482-106 Fax: +49 / (0)30 - 28482-107 mailto: h.albers@bwe-vorstand.de www.wind-energie.de