An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tuesday 3rd May 04/05/2011 • 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight • 9:45 probes injected in the LHC but some SPS problems • 11:45 Filling for physics fill #1756 • 13:45 Stable beams • 14:03 Beam dumped due to Uninterruptable Power Supply (UPS) problem point 5 (EBS 11/56) • UPS problem point 5 • 20:15 External company on site to fix faulty UPS • Smoke alarm due to UPS fault and search lost • Presently waiting for additional, external UPS experts to arrive LHC 8:30 meeting

  2. Fill #1756 Bunch sizes before dump: • Injection not very clean, oscillations and losses in the transfer line • Some bunches vertically blown up (see below) • Lumi’s around 730 Hz/ub • Max values Atlas 725, CMS 730 Hz/ub • Atlas corrected published lumi downwards, now agrees with CMS • Only lasted 18 minutes – dump UPS LHC 8:30 meeting

  3. UPS broken in UJ56 • Fault at 14:03 • Decided not to continue while shunting out with other UPS • External company required • 20:15 External piquet on site • Tried elements from UPS in IP4 to fix broken UPS IP5 • 04:00.... Did not work • Waiting for more experts to arrive at 9 am • More news asap LHC 8:30 meeting

  4. Plan • 6:00 Start of MD period • Until Monday morning, when the TS will start • First MD of Werner cancelled • Will pick up the MD program with a working machine as soon as possible LHC 8:30 meeting