An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I. An overview • Geotechnical Features Problematical => Need to go through the soil How doing it ?

  2. I. An overview • Geotechnical Features Problematical => Need to go through the soil How doing it ? What it depends of? The nature of the soil : - hard ground - soft ground The size of the hole we need

  3. I. An overview • Geotechnical Features a) Drilling precautions Drilling consists of breaking the cohesion of soil particlesThese particles could create several problems -> How to avoid it? • Evacuation of the destructed materials • Cooling of the drilling head • Walls: - to avoid rock crumbling - with bentonite or casing

  4. I. An overview • Geotechnical Features a) Drilling precautions

  5. I. An overview • Geotechnical Features a) Drilling precautions b) Hard ground drilling devices The trepan: Oldest technique Create a shock in rock with the blade Evacuation with water Heavy blade

  6. I. An overview • Geotechnical Features a) Drilling precautions b) Hard ground drilling devices The pneumatic hammer: Most used technique Create a rotation to get a better drilling Metal mass moved by a flux of air in body Could be handled or mounted in a frame

  7. I. An overview • Geotechnical Features a) Drilling precautions b) Hard ground drilling devices The tricone: Fastest technique (15 m per day) Tooth made of heavy metal Rotation process Injection of mud and water & cooling

  8. I. An overview • Geotechnical Features a) Drilling precautionsb) Hard ground drilling devices c) Drilling a soft ground The auger: Most used technique Could drill big diameters Rapid Also Shovels, deflection, high pressured water…

  9. II. Precise drilling Application • Project Presentation What? 300 meters long directional drilling under a river and a train way For? A pipeline Why? Protection of environment Global costs reduced No loose for agriculture Need of a geotechnical survey

  10. II. Precise drilling Application • Project Presentation • Geotechnical survey Rapid look of the zone: - geologic map - aerial photography Precise tests: - 3 core drillings - Radiography of the zone Look at the results

  11. II. Precise drilling Application • Project Presentation • Geotechnical survey 3 different areas: - alluvium (sand & pebbles) - - limestoneTry to avoid alluvium => Deepest path drilling Need of a resistive drill to go through the limestone How to manage the drill

  12. II. Precise drilling Application • Project Presentation • Geotechnical survey • Material solutions Look at the results