An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Appendix IIAccommodation ReviewWorkspace Performance ImprovementThe London Borough of EalingStudy Findings, Workspace Models & Conceptual Stacking12 December 2007

  2. Notes • All data and analysis in this document is based on the following: • Information provided by LBE on 07 December 2007: • Team staffing numbers • and 10 December 2007: • Team location plans • Team directorate associations • Work setting utilisation data collected in July and October 2007 • Where team staffing numbers were not supplied then these were estimated based on the planned occupancy ratio of 125% (5:4) • Where teams reached 100% utilisation during the study period we have not made any adjustment for staff members who might have left PH to work elsewhere

  3. Study Findings Summary

  4. Perceval House (NB: Calculations made prior to recent moves into PH including accounts payable and housing) Staffing (estimated) 1917 / 86 teams Occupancy 122% Maximum* utilisation 82%(1296) Minimum* utilisation 63%( 996) Mean* utilisation 73%(1142) 41 teams reaching 100% utilisation Storage demand PH 3878 m Storage demand Annex 528 m Total storage demand 4406 m * Not including ground floor † Not including personal storage pedestals, communal high density storage, communal misc storage for stationery etc

  5. Directorate Groupings

  6. Maximum Utilisation Minimum Utilisation Mean Utilisation Work-setting Occupancy Staffing Floor Directorate Grouping 1st Keith Townsend Environmental Services 37 30 123% 83% 50% 70% 1st Keith Townsend Switchboard 12 10 120% 100% 50% 73% 1st Keith Townsend Social Services 12 10 120% 70% 30% 47% 1st Keith Townsend Call Centre Management 5 4 125% 75% 0% 15% 1st Keith Townsend Multi Media Team 27 22 123% 82% 50% 68% 1st Keith Townsend Housing Benefits Back Office 100 80 125% 95% 55% 77% 1st Keith Townsend Parking Services 67 47 143% 89% 70% 83% 1st Keith Townsend Environmental Crime 27 22 123% 86% 45% 67% 1st Keith Townsend Revenues Call Centre 18 18 100% 100% 50% 81% 1st Keith Townsend Parking Call Centre 6 6 100% 100% 50% 83% 1st Keith Townsend Income Reconsiliation 3 3 100% 100% 67% 93% 1st Keith Townsend Call Centre & Reception Management 2 2 100% 100% 0% 80% 1st Keith Townsend Parking Call Centre mgt 2 2 100% 100% 0% 90% 1st Keith Townsend Beneifits Call Centre & Debt Centre 26 21 124% 90% 52% 72% 1st Keith Townsend Customer Services & Operations 15 12 125% 83% 33% 63% 4th Keith Townsend Town Planning 64 48 133% 98% 69% 86% 4th Keith Townsend Building Control & Surveying Services 30 24 125% 96% 54% 77% 4th Keith Townsend Repairs & Adaptions 13 14 93% 100% 50% 79% 4th Keith Townsend Planning Policy & Transport Proj inc WLT 39 31 126% 97% 65% 87% 4th Keith Townsend Highways Management 26 21 Directorate Group – Environment and Customer Services 124% 100% 76% 95% 4th Keith Townsend Lib, Learning & info + Adult Learning + Major Projects and Assets 12 15 80% 100% 60% 87% 4th Keith Townsend Active Ealing 6 11 55% 100% 64% 88% 4th Keith Townsend Parks & Cemetries 36 24 150% 100% 50% 77% 4th Keith Townsend Environment Directors 7 6 117% 100% 67% 90% 5th Keith Townsend Arts, Community Centres and Registrars 2 2 100% 100% 0% 70% 5th Keith Townsend TEMP Envirocrime 10 8 125% 100% 0% 49% estimated Allocated Work-settings 493 Occupancy 123% Staffing 604 Maximum utilisation 89% / 439 Minimum utilisation 66% / 323 Mean Utilisation 77% / 382

  7. Directorate Group – Regeneration and Housing estimated Allocated Work-settings 168 Occupancy 130% Staffing 219 Maximum utilisation 88% / 148 Minimum utilisation 49% / 83 Mean Utilisation 76% / 128

  8. Directorate Group – Corporate Resources estimated Allocated Work-settings 367 Occupancy 123 % Staffing 450 Maximum utilisation 82% / 301 Minimum utilisation 64% / 235 Mean Utilisation 73% / 268

  9. Directorate Group – Children and Adults estimated Allocated Work-settings 478 Occupancy 119% Staffing 567 Maximum utilisation 76% / 361 Minimum utilisation 51% / 246 Mean Utilisation 65% / 309

  10. Directorate Group – Chief Executives Office estimated Allocated Work-settings 68 Occupancy 113% Staffing 77

  11. Potential space on toWorkspace Models

  12. Workspace models Note: Consultants were requested to model a number of scenarios which ranged from all staff working from a fixed work station (1:1) to a completely flexible layout with no fixed work stations and their impact upon total capacity.

  13. Workspace model - option1 • Scenario Based on assumed principles: • All workspaces are shared within team (‘Team’ work-settings) only • ‘Team’ work-setting allocation based on maximum number of utilised work-settings • Caution would have to be taken with groupings which reached 100% utilisation levels

  14. Workspace model option1 – Team allocations Environment & Customer Services Work-settings 461 Staffing 604 Occupancy 131% estimated

  15. Workspace model option 1 – Team allocations Housing and regeneration Work-settings 160 Staffing 219 Occupancy 137% estimated

  16. Workspace model option 1 – Team allocations Corporate Resources Work-settings 315 Staffing 450 Occupancy 143% estimated

  17. Workspace model option 1 – Team allocations, Children & Adults Work-settings 413 Staffing 567 Occupancy 137% estimated

  18. Workspace model option1 – Team allocations, Chief Executive Work-settings 66 Staffing 77 Occupancy 117% estimated

  19. Workspace model option 1 – Stacking Plan, sample floor (1st Floor) (KT = Keith Townsend, Environment and Customer Services) KT KT KT KT

  20. Workspace model option 1 – Stacking Plan, sample floor (2nd Floor) (DA = David Archibald, Children and Adults) DA DA DA DA