An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb Project Review Jim Libby 3rd October 2005 LHC and LHCb status LHCb in Oxford Producing the hardware Preparing for data I: software Preparing for data II: physics

  2. 2 Ring Imaging Cerenkov detectors (RICHes) provide particle ID over a wide range of momenta-key for hadronic B decays important for CP studies LHCb introduction Schematic of the LHCb experiment • LHCb is designed to: • make precision measurements of CP violation in the decay of all flavours of B mesons • search for New Physics in rare B decays that only proceed at loop level in the Standard Model i.e. B→K*μ+μ- • Aiming to be making measurements from day one in 2007 RICH electronics, mechanics and software, along with physics preparation and LCG are Oxford’s LHCb activities Oxford Project Review 2005

  3. LHC and LHCb status • LHCb at IP8 on LHC ring-cryoline installation complete about this point • LHC dipoles are being installed: nearly 100 out of 1234 • LHCb installation is on schedule • RICH2 ready to begin life underground • t0 for LHC still 1/7/07 Oxford Project Review 2005

  4. RICH 2 complete Oxford Project Review 2005

  5. LHC and LHCb status • LHCb at IP8 on LHC ring-cryoline installation complete about this point • LHC dipoles are being installed: nearly 100 out of 1234 • LHCb installation is on schedule • RICH2 ready to begin life underground • t0 for LHC still 1/7/07 Oxford Project Review 2005

  6. The Oxford group Faculty: N. Harnew & G. Wilkinson Dept. Lecturer: JL Adv. PPARC fellow: J. Rademacker* Postdocs: M. Adinolfi & R. Muresan Students: L. Somerville, V. Gligorov, I. Stoke-Rees (GRID), A. Powell &S. Brisbane Electronic Engineers: J. Bibby & P. Sullivan & (M. Jones) Electronic Technicians: N. Rotolo Drawing office and workshop: R. Senanayake, T. Handford, (W. Lau, B. Ottewell & S. Yang) System Engineers: S. Topp-Jorgensen & (I. McArthur) Grid programmers: C. Cioffi & A. Soroko New arrivals since October 2004 *Shared with CDF (Invaluable support) To be appointed: responsive RA to work on charm physics Oxford Project Review 2005

  7. Schematic of a HPD section silicon detector readout pixel chip Producing the LHCb hardware • Oxford’s responsibility is the front-end electronics for the RICH detectors • Hybrid Photo-Detectors (HPD) detect the Cherenkov radiation induced photoelectrons on a 32×32pixel detector encapsulated within the detector • The L0 electronics: • are located on the detector • transfer the accepted data at a rate of 1 MHz • services the pixel chip with low voltage, timing, trigger and control signals 72 mm Oxford Project Review 2005

  8. Fibre optic data links PINT FPGA PIXEL anodes JTAG: board/PIXEL setup 16.5 cm Kaptons 10 cm Trigger, Timing and Control PILOT: reference I and V for PIXEL The production L0 board Oxford Project Review 2005

  9. RICH front-end electronics • Prototype L0 board validated in test beam during autumn 2005 and extensive lab tests in Oxford • Production Readiness Review passed in June • A few recommendations being implemented • Production ready to commence once final tests completed • < 1 month • 300 boards to be produced then tested in Oxford • 242 required to equip both RICHes • On schedule for system tests and installation Single track Cherenkov ring: 10 GeV/c πinC4F10 radiator (RICH1) Oxford Project Review 2005

  10. Max deformation (out of the plane of plate i.e. bending): 0.144mm RICH1 mechanics • With IC produced final design of the RICH1 gas enclosure • Produced final engineering drawings • Performed FEA to validate design • Responsible for procurement • Should be at Oxford in a couple of weeks • Programme of leak tests in Oxford • Will perform installation with IC • Design of mechanical support and lifting rig S. Yang R. Senanayake Oxford Project Review 2005

  11. RICH commissioning • Neville is the RICH project leader during the production, integration and commissioning phase of LHCb • Ongoing system tests at CERN with integration of production HPDs, L0 and L1 electronics, low and high voltage and control systems • Mechanical units of 16 HPDs (columns) • Single and triple column tests at CERN and with beam at Frascati in the next 6 months • 40 MHz beam tests at CERN in summer 2006 • Installation of L0 electronics in RICH2 will begin next year Significant participation by Oxford Oxford Project Review 2005

  12. Preparing for data – RICH software • RICH software project coordinated by Guy: • Simulation • Reconstruction: pattern recognition, particle ID and higher level triggers • Calibration: alignment, calibration with data and database • Using golden kinematics of D*+→D0π+ decays to select a pure samples of D0 →K-π+ (and charge conjugate decays) • The charge of the tracks from the D0 decays define pure samples of π and K from which identification efficiencies can be derived solely from data • Preliminary studies show that the efficiencies match those derived from MC truth • Potential for sub % accuracy π K Raluca Muresan Oxford Project Review 2005 (GeV/c) (GeV/c)

  13. Preparing for data – losing the MC crutch • Lifetime fitting • V. Gligorov has implemented Jonas’ CDF method for using a data-derived acceptance function to correct for impact parameter selection induced bias • In a similar vein, but moving away from the RICH and toward physics studies • Flavour tagging • L. Somerville has developed a methods to estimate mistag rates from self tagging control channels such as B→J/ψK* • encouraging first results The fitted lifetime : 475.0 ± 12.9 μm True B lifetime : 460.2 μm Oxford Project Review 2005

  14. Exploiting the data • LHCb will make important measurements from day 1 • To achieve this a new working group structure is in place: • Guy co-convener of the CP measurements group • A physics book targeted at outlining the path to first publications is in preparation-completed by end of 2006 • Oxford is very active in physics studies particularly related to the angle  Oxford Project Review 2005

  15. Getting at γ • LHCb will make direct measurements of the unitarity triangle angle γ • Current indirect precision will improve before 2007 • We must do better directly! • Classic channel Bs→DsKsuffers several problems with ambiguous solutions and limited statistics (14o precision in one year) EPS 2005 without direct measurements • We are exploring new channels to measure γ Oxford Project Review 2005

  16. Measuring γ: B+→D0K+ • γis the weak phase betweenb→cus (Vcb) andb→ucs (Vub) • Two very promising strategies being pursued in Oxford • Dalitz plot fit to 3 body decays D0 →Ksππ • exploits interferences between sub-resonances in decay • Current world best measurement from e+e-B factories • LHCb expects ~2000 events to tape per year • Atwood-Dunietz-Soni method withD0→KπandD0 →Kπππ • Toy studies by Guy indicate ~50 with 1 year of LHCb data • Global fit strategies No need for a time-dependent analysis Oxford Project Review 2005

  17. Exploiting the data • LHCb will make important measurements from day 1 • To achieve this a new working group structure is in place: • Guy co-convener of the CP measurements group • A physics book targeted at outlining the path to first publications is in preparation-completed by end of 2006 • Oxford is very active in physics studies particularly related to the angle  • New RA will explore the potential for charm physics at LHCb • Inclusive D* higher level trigger stream will provide ½ a billion D0 decays a year • Allows sensitivity to direct CP violation at level well below that predict by the SM • Unique opportunity to explore possible new physics induced CP violation in the up-type quark sector complements studies in down-type K and B sectors Oxford Project Review 2005

  18. Toward the rolling grant-manpower Colour Key Academic RA Support *Positions currently end 9/07. Plan for them to be continued. (Current post holders initials in parenthesis) £5-10k non-staff cost/annum Oxford Project Review 2005

  19. Looking forward to 2006 • When this talk is given next year data taking will be 9 months away! • L0 electronic production near completion • RICH1 will be installed • RICH commissioning of hardware and software will be well underway • Putting the physics tools in place to maximize the data from day one: • Controlling systematic effects with data • Measuring γ • Charm physics Oxford Project Review 2005

  20. LCG activities Oxford Project Review 2005