1 / 8

Global Air Transportation Execution System (GATES) Program Manager: Maj Lori Winn Development Contractor: Mr. Craig Hu

Global Air Transportation Execution System (GATES) Program Manager: Maj Lori Winn Development Contractor: Mr. Craig Hughes. GATES Milestones. V3.00 Implementation – Mar-Apr ‘07 Final phase of aerial port functionality on the Web V3.01 Implementation – Nov ’07

huey
Download Presentation

Global Air Transportation Execution System (GATES) Program Manager: Maj Lori Winn Development Contractor: Mr. Craig Hu

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Global Air Transportation Execution System (GATES) Program Manager: Maj Lori Winn Development Contractor: Mr. Craig Hughes

  2. GATES Milestones • V3.00 Implementation – Mar-Apr ‘07 • Final phase of aerial port functionality on the Web • V3.01 Implementation – Nov ’07 • Turnover for Final System Test – Jun ‘07 • First phase of water port functionality on the web • CONUS and OCONUS Regional Databases replaced • V4.00 Implementation – Sep-Oct ’08 • Turnover for Final System Test – Feb ‘08 • Second phase of water port functionality on the web • Most terminals replaced • Could include first EDI functionality • V4.01 Implementation – Jan ’09 • Turnover for Final System Test – Jul ‘08 • Final phase of water port functionality on the web • Unique terminals replaced

  3. GATES Team • PM: Maj Lori Winn, AMC/A6IM • Deputy PM: Ms. Sue Dolphy, AMC/A6IM • Finances: Ms. Judy Sealock, AMC/A6IM • Interfaces: Mr. Ray Seils& Ms. Lakita Humber, AMC/A6IM • Technical Advisors: Mr. Martin McGibney & Ms. Deborah Davis, MITRE • Test Lead: Mr. Ed Kebel, 805 CSPTS/SCV • Development Team: • Task Lead: Mr. Billy Woody, CSC • Interfaces: Mr. Craig Hughes, CSC • Functional Managers: AMC/A4TI, USTC/J3 DCD, SDDC G4 GATES PMO DSN 779-5733/Cml 618-229-5733

  4. ASIFICS DEAMS GDSS GDSS II GATES Aerial Port Interfaces Load Planning AALPS GATES Pallet Handling Data MMHS Unit Move Passenger DCAPES Cargo and Passenger Manifests TCAIMS II Unit Move Cargo LOGMOD ITV Data GTN Disk File Based Cargo ATCMD DS2T Manifest/Movement Data Cargo ATCMD TC-ACCIS Reconciliations Cargo ATCMD Passenger List TCAIMS II Air Mission Data Cargo ATCMD Load Data FACTS Movement Data ITV Data – FEDEX, UPS, etc Cargo and Passenger Manifests CMOS CMI INS Passenger Data Cargo ATCMD APIS DSS Passenger Movement Data ITRAM Commodity Data GEX Reference Data TMDS Movement Data PIPELINE Data Queries SMS Cargo ATCMD Data Queries TRACKER EDQMS Movement Data Data Queries RFID Tag Data ABDM RF-ITV SERVER

  5. Transaction Volume

  6. ASIFICS DEAMS GDSS GDSS II GATES Aerial Port Interfaces UDF AALPS GATES UDF MMHS UDF DCAPES DTR: TAA, TAT, T_A, T_E, T_F, T_G, T_H, T_I TCAIMS II UDF LOGMOD UDF GTN Disk File Based DTR: T_1, T_5, T_6, T_7, T_9 DS2T UDF DTR: T_1, T_5, T_6, T_7, T_9 TC-ACCIS UDF DTR: T_1, T_5, T_6, T_7, T_9 TCAIMS II USMTF DTR: T_1, T_5, T_6, T_7, T_8 T_9 USMTF FACTS DTR:TAA, T_A, T_D DTR: TAA, T_A, T_I, TK6 CMOS DTR: TAA, TAT, T_A, T_E, T_F, T_G, T_H, T_I CMI UNEDIFACT DTR: T_1, T_5, T_6, T_7, T_8 T_9 APIS DSS UDF ITRAM Web Query/Result GEX UDF TMDS DTR: TAA, TAT, T_A, T_D, T_I, TK6 PIPELINE Direct Query/Result SMS DTR: T_1, T_5, T_6, T_7, T_8 T_9 Direct Query/Result TRACKER EDQMS DTR: TAA, TAT, T_A, T_D, T_I, TK6 Direct Query/Result UDF ABDM RF-ITV SERVER

  7. TOPS DPS GATES Water Port Interfaces (to be) Movement Data Movement Data AWRDS MISIL GATES Cargo ATCMD Cargo Data MDSS II BPS Disk File Based ITV Data Cargo ATCMD TC-ACCIS IRRIS ITV Data Cargo ATCMD TCAIMS II / USMC GTN Web Query/Result LINK Cargo ATCMD Movement/Billing Data CAB Movement Data FACTS Manifest Data BCS3 Cargo ATCMD CMOS Container Data GFM Cargo ATCMD DSS Query/Result PAT Commodity Data GEX Movement Data DORRA Movement Data PIPELINE Cargo Status Data TOS Movement Data TRACKER Reference Data TMDS RFID Tag Data Cargo ATCMD, Updated Shipping Inst. RF-ITV SERVER IBS Cargo Data Shipping Instructions, Movement Data ICODES Stow Plan ITV Data SMS Cargo ATCMD Rejects/Acks MTMS Query/Result SER Movement Data NLAC Container Data AAFES

  8. TOPS DPS GATES Water Port Interfaces (to be) UDF DTR: TT_, TT6, TT7, TTV AWRDS MISIL GATES DTR: T_1, 2, 3, 4, 5, 6, 7, 9 Cargo Data MDSS II BPS Disk File Based DTR: T_1, 2, 3, 4, 5, 6, 7, 9 DTR: T_1, 2, 3, 4, 5, 6, 7, 8, 9; TY_, TAJ; T_K, L, M, N, O, P, Q, R TC-ACCIS IRRIS DTR: T_1, 2, 3, 4, 5, 6, 7, 9 DTR: T_1, 2, 3, 4, 5, 6, 7, 8, 9; TY_, TAJ; T_K, L, M, N, O, P, Q, R TCAIMS II / USMC GTN Query/Result LINK DTR: T_1, T_8, T_9 Movement/Billing Data CAB DTR: TT_, TT6, TT7, TTV FACTS DTR: TAJ; T_K, L, M, N, O, P, Q, R BCS3 DTR: T_1, 2, 3, 4, 5, 6, 7, 9 CMOS UDF GFM DTR: T_1, 2, 3, 4, 5, 6, 7, 9 DSS Query/Result PAT Query/Result GEX UDF DORRA PIPELINE DTR: TT_, TT6, TT7, TTV, TAG, TAI, TTU UDF TOS DTR: TT_, TT6, TT7, TTV TRACKER UDF TMDS UDF DTR: T_1, 5, 6, 7, 9; UDF RF-ITV SERVER IBS UDF ICODES UDF SMS DTR: T_1, 2, 3, 4, 5, 6, 7, 8, 9; TY_, TAJ; T_K, L, M, N, O, P, Q, R Direct DB Connection MTMS Query/Result SER NLAC DTR: T_1, 2, 3, 4, 5, 6, 7, 9; T_J, K, L, M, N, O, P, Q, R TYC, TYS, TYT, TYU, TYW Report AAFES