1 / 7

the e-Logbook and the future

the e-Logbook and the future. view of e-Logbook. Features: WIKI style text input insert pictures and documents PDF will be shown by it’s content works with most browsers applet for the dynamic tree view of the shifts applet to do the spell checking remote access with https

huslu
Download Presentation

the e-Logbook and the future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. the e-Logbookand the future Sven Karstensen, DESY

  2. view of e-Logbook • Features: • WIKI style text input • insert pictures and documents • PDF will be shown by it’s content • works with most browsers • applet for the dynamic tree • view of the shifts • applet to do the spell checking • remote access with https • hosted at DESY • Questions: • what do you need ? • what do you expect ? • is one logbook enough ? https://ttfinfo.desy.de/CALICEelog-sec Sven Karstensen, DESY

  3. The future… ...will bring the advantage of GANMVL/GDN (Global Accelerator Network Multipurpose Virtual Laboratory / Global Detector Network)to you.what is behind this glorious name? Sven Karstensen, DESY

  4. GANMVL includes • Web-Portal • SSO (single sign on) • VRVS (Virtual Rooms VideoConferencing System) • e-Logbook • VNC (Virtual Network Computing) connections • high quality video and audio systems • Virtual instruments (oscilloscope, camera, multimeter,…) Sven Karstensen, DESY

  5. GANMVL / GDN Schema Sven Karstensen, DESY

  6. Timetable (probably) • In the last GANMVL collaboration meeting (23.-24. Feb 2006) it was decided to install the first prototype at the end of May 2006 inside DESY. • One for GANMVL and one for GDN • Hopefully we can use the CERN Testbeam time (and you ;-) ) as a good area to get experience with all the new tools Sven Karstensen, DESY

  7. Just imagine Sven Karstensen, DESY

More Related