150 likes | 316 Views
MESA next steps. MESA #13. MESA TSG Current WI DTR/MESA-SYS0070015v311. Current WI Title: Analysis of System of Systems networking technologies Scope and Field of Application: Analysis of system of systems networking technologies and air interface technologies
E N D
MESA next steps MESA #13
MESA TSG Current WI DTR/MESA-SYS0070015v311 • Current WI Title: Analysis of System of Systems networking technologies • Scope and Field of Application: Analysis of system of systems networking technologies and air interface technologies • Rapporteur: 4DK Technologies (Mar Tarres)
Objectives • Understand the level of conformity of commercial technologies to Public Safety requirements for broadband data • Identify how existing and roadmapped capabilities deliver on Public Safety requirements • Identify additional technology capabilities and technology enhancements that need to be developed and standardized to deliver on the Public Safety requirements • Create a framework of reference for Public Safety to evaluate how the different technologies meet on the different elements and requirements of the System of System architecture
Deliverables • Develop a high level architecture and functional requirements based on Project MESA SoR • Conduct a technology capabilities to functional requirement mapping • Identifying timing of capabilities (existing vs roadmapped) • Identifying capability gaps and enhancements that will need to be developed • Set up a process to update the technology capabilities to requirements mapping to include new technologies as they become available
Rules of Engagement for this Phase of Work • The work item will build upon the proposal received on March 2006 • The work item should use work already done in TIA/TR8.8 and APIC/BBTG and consider 802.11ma, 802.16e, 1x/EV-DO and WCDMA • The work can also include new technologies proposed by the TSG contributors • The work shall include a peer review • Avoid duplicating work developed on TIA and ETSI • Contributors and users are expected to be involved ALL ALONG the development of the activities • Peer review will be conducted off-line and conference calls; face to face meetings are expected to “sanction” the work and plan for next steps
Approach Project MESA SoR Project MESA Functional Requirements Technology Capabilities to Functional Requirements Mapping Reference Framework to evaluate pro / cons of different technology options New Functional and Technology requirements for Technology Standardization Bodies TIA ETSI
12/1 1/15 4/30 3/20 1/30 6 Month Workplan Overview 1.A Refine High-level Architecture 1.B Review and Feedback from SSG, TSG 2.A Create analysis matrix template 2.B Review and Feedback from SSG, TSG 3.A Map user requirements to functional requirements 3.B Review and Feedback from SSG, TSG 4.A Populate analysis matrix 5.A Technology gap analysis and roadmapping 6.A Evaluate next steps Monthly status updates • Gap Analysis & roadmapping complete for first set of functional requirements • Consensus on: • HL Architecture • Matrix • Requirement mapping Deliverables • Analysis matrix complete for first set of functional requirements • High-level architecture draft • Analysis matrix template draft • User req. to Funct. Req. mapping • MESA meeting to review technology proposals and roadmapping & define next steps Plenary sessions • TSG Meeting to reach consensus on 3 initial deliverables
Task description Analysis of System of System Networking Technologies
Task description Analysis of System of System Networking Technologies
Task description Analysis of System of System Networking Technologies
Task description Analysis of System of System Networking Technologies
Task description Program Management
Next Steps • Approve and publish plan • Collect contacts of all TSG members actively participating in WI • Establish WI logistics • Schedule meetings • Set-up mailing lists • Etc • Start the work!!
Tasks • Create project plan • Refine high level architecture given in the overview document – December 1st 06 (Mark Klerer) • Create a matrix template - December 1st 06 – (Mar Tarres) • Mapping user requirements to functional (operational, performance, application, management) requirements - January 15th 07 – (Mar Tarres) • Consensus on the first iteration of the matrix - January 30th 07 (TSG SYS) • Consensus on the high level architecture - January 30th 07 (TSG SYS) • Schedule the face to face meeting (tentative week of January 29th 07) (TSG chair) • Populate the matrix from proposals received – March 20th 07 • Common requirements/optional • Gap analysis - (TSG SYS) • Consider new proposals – final date March 20th 07 • Evaluate next steps