1 / 3

MESA next steps

MESA next steps. MESA #13. MESA TSG Current WI DTR/MESA-SYS0070015v311. Current WI Title: Analysis of system of systems networking technologies;

starr
Download Presentation

MESA next steps

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MESA next steps MESA #13

  2. MESA TSG Current WI DTR/MESA-SYS0070015v311 • Current WI Title: Analysis of system of systems networking technologies; • Scope and Field of Application: Analysis of system of systems networking technologies and Air Interface technologies based on industry responses received on March 20, 2006. Should use work already done in TIA/TR8.8 and APIC/BBTG and consider 802.11ma, 802.16e, 1x/EV-DO and WCDMA. Shall include a peer review. • Rapporteur:

  3. Tasks • Create project plan • Refine high level architecture given in the overview document – December 1st 06 (Mark Klerer) • Create a matrix template - December 1st 06 – (Mar Tarres) • Mapping user requirements to functional (operational, performance, application, management) requirements - January 15th 07 – (Mar Tarres) • Consensus on the first iteration of the matrix - January 30th 07 (TSG SYS) • Consensus on the high level architecture - January 30th 07 (TSG SYS) • Schedule the face to face meeting (tentative week of January 29th 07) (TSG chair) • Populate the matrix from proposals received – March 20th 07 • Common requirements/optional • Gap analysis - (TSG SYS) • Consider new proposals – final date March 20th 07 • Evaluate next steps

More Related