An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of Test Beam AnalysisMeeting - Jan 26 Eduardo do Couto e Silva

  2. DATA STORAGE/RETRIEVAL • 400 Gb disk provided by SCS thanks to Richard (1 week) • ORACLE/Web base electronic log (1 week) Dave,Traudl,Karen • Dave Lauben: Tagger data not all in ROOT format, some data needs synchronization between subdetectors, fix particular runs for the neutron counters

  3. ROOT FORMAT • Dan waiting feedback from everyone - deadline 1 week after web log system • Preliminary checks Dan/Berrie (comparing with PAW ntuples) • Need IRF-ROOT interface - Dan/Sawyer ? • Need IDL wrapper - Jeff, Heather, Dan

  4. TRACKER STUDIES • Aim at freezing ROOT format (2 weeks) • Propose standalone RECON for all subsystems (TKR ready in 1 week), means more flexibility and improve analysis speed. • Several studies to be performed on tracker, Tasks at UCSC (Ian, Jeff, Robert) and at SLAC (Derek, Eduardo, Marios, Takanobu) • Jose Angel/Wilko concentrate on RECON aiming at obtaining PSF’s.

  5. RAW GLASTSIM RAW GLASTSIM ROOT IRF ROOT IRF RECON GLASTSIM ROOT Ntuple

  6. PRELIMINARY PLOTS from • Takanobu - dead channels (tracker) • Berrie - Energy (CAL) , CAL vs ACD, • Berrie reported problems with ACD veto (discrimator bits) D. Lauben is investigating • Al/Eduardo - Pulse Height vs Time (neutron counters)

  7. DOCUMENTATION • Traudl - nice user guide, concise and complete, needs feedback (on going medium term development) • Eduardo/Karen - Web page with appropriate links and repository for notes (this week)

  8. AOB • Web conference suggested by Steve Ritz • Eduardo waits for feedback from people to decide date for regular meetings - Monday or Friday (allocate 2 h slot). • Results for paper will be discussed later since there are more urgent needs now (Data storage and log, preliminary checks, RECON , IRF-ROOT, ROOT-IDL)

  9. SUMMARY • 1 week - to get web based data log system • 2 weeks - data stored into 400Gbyte disk and “freeze” ROOT format • 1 month - IRF-ROOT interface (needed for GLASTSIM with standalone RECON) • next meeting - expect plots from different detector studies, revisit IDL/ROOT wrapper, plots from RECON-standalone