OVERVIEW OF LONG LASTING INSECTICIDAL NETS FOR MALARIA Challenges & Way Forward

OVERVIEW OF LONG LASTING INSECTICIDAL NETS FOR MALARIA Challenges & Way Forward . Malaria Medicines & Supplies Services RBM Partnership Secretariat . Products Available. LLINs: 2 WHOPES-certified products, 3 manufacturers, 1 in Africa Olyset PermaNet ® New Development :

ilya
Download Presentation

OVERVIEW OF LONG LASTING INSECTICIDAL NETS FOR MALARIA Challenges & Way Forward

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OVERVIEW OF LONG LASTING INSECTICIDAL NETS FOR MALARIAChallenges & Way Forward Malaria Medicines & Supplies Services RBM Partnership Secretariat

  2. Products Available • LLINs: 2 WHOPES-certified products, 3 manufacturers, 1 in Africa • Olyset • PermaNet® • New Development: • Further technical development and analyses of potential end-point conversion of ordinary nets to LLINs through long-lasting treatment ongoing - Supply-side implication: 6-50m LLINs per annum. Net manufacturers are exploring the possibility of using the technology for factory treatment of nets. Newest Development: • Significant recent investor interest in LLIN technology

  3. Mosquito Net Options

  4. Procurement Challenges: LLIN or ITN?Strategic Procurement = Efficient Programme, Planning & Execution • Disbursements must be linked to procurement and planned distribution • Product selection must be linked to established (procurement) lead times for LLINs • Procurement of LLINs must be linked to clear pre-transmission season availability and distribution objectives • Programmes, therefore, mustadopt open mind to ITN procurement and distribution • Use institutional buyers – benefit: more certain availability, stable price, country level value added, total cost of ownership reduction, economies of scale

  5. PROCUREMENT CHALLENGES: LOGISTICS : Weights, Volumes & Costs The Shipment and Distribution of nets are a major logistical challenge. Depending, for example, on the type of LLIN, international shipping and handling costs (ITSH), inland transportation, testing and inspection costs could run between 45% and 65% of net cost. N.B. Different types have different weights and volumes Data based on Rectangular net size 150 x 190 x 180cm

  6. FORECASTS / NEEDS 1. Recent RBM forecast establishes the vulnerable population in Africa (pregnant women & <5s) as 122m. With funding reportedly available for approximately 40 million, the net-need GAP for this vulnerable group is +/- 82m. COVERAGE IMPACT: 20% 2. By contrast, the current at risk population in Africa is 645m. COVERAGE IMPACT:NEGLIGIBLE • It is estimated that 50 million nets will need re-treatment by 2007 (upgrading to LLINs more desirable) and another 50 million worn nets will have to be replaced. • Estimations should also take into account ITNs/LLINs needed according to population growth figures

  7. By December 2005, production should have more than doubled The above figures are production objectives provided by manufacturers. Given the current problems manufacturers are having in scaling-up their production, such capacities could potentially not be achieved until well into 2006.

  8. Way Forward • Explore possibility of a NEPAD-led LLIN development and manufacturing consortia • Bring more pesticide and fibre technology companies on board (technology improved and better adapted for local production, reduced prices) • Increase knowledge on long term efficacy and social acceptability of LLINs under programme conditions • Promote continued purchase and use of ITNs • Closer MMSS collaboration with RBM partners operating in highly at-risk countries in Africa. AED/NetMark currently working to improve QC at existing African textile manufacturers as a precursor to development of the LLIN technology in Africa. With USAID funding, NetMark planning a Quality Control Workshop for September 2005 in Johannesburg

  9. WAY FORWARD ▪ MMSS has embarked upon an intensive, multi-pronged initiative to ensure: - Emergence of Public Private Partnerships - Technology Transfer (expand/replicate Sumitomo/A to Z initiative) - Bridging geographical gap between manufacturing and shipping points, a WTO/ITC initiative, (manufacturing/buying in Africa for Africa), thereby reducing significantly the delivery time for LLINs to highly vulnerable groups in at risk countries

  10. Thank you