Deb Cooling Time Study

Deb Cooling Time Study. 4s cycle time and changed debuncher cooling OFF timers Data taken: Nominal running…every pulse into Acc DCCT, VSA measurements and production SEM806 ARF1 OFF to measure profile on Injection orbit Every other pulse into Acc (D:ESEPC timer)

imani-roman
Download Presentation

Deb Cooling Time Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deb Cooling Time Study • 4s cycle time and changed debuncher cooling OFF timers • Data taken: • Nominal running…every pulse into Acc • DCCT, VSA measurements and production • SEM806 • ARF1 OFF to measure profile on Injection orbit • Every other pulse into Acc (D:ESEPC timer) • DCCT measurement of D/A transfer eff • Previous study showed • SEM in decreases D/A transfer by 1.5% • DRF2 off decreases D/A transfer by 12%

  2. SEM806 2.4s to 2.2s +7.2% +8.2%

  3. VSA Left Over Beam Meas. 2.4s to 2.2s -1.5%

  4. Accumulator DCCT 2.4s to 2.2s -3%

  5. Acc DCCT measurements

  6. Accumulator Production 2.4s to 2.2s -2% (-5%)