NERC Event Analysis Overview. ERCOT ROS Meeting Austin, Texas May 15, 2006. Administration. Standards. Reliability Readiness. Training, Education & Operator Certification. Members’ Forums. Legal & Regulatory. Finance & Accounting. Compliance & Organization Certification.

iokina
Download Presentation

NERC Event Analysis Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERC Event Analysis Overview ERCOT ROS Meeting Austin, Texas May 15, 2006

  2. Administration Standards Reliability Readiness Training, Education & Operator Certification Members’ Forums Legal & Regulatory Finance & Accounting Compliance & Organization Certification Reliability Assessment & Performance Analysis Situation Awareness & Infrastructure Security Information Technology Human Resources Future Adequacy Benchmarking Event Analysis President & CEO Committees Program GroupsSubject Matter Expert Groups

  3. Overall Scope of RAPA Programs • Reliability Assessment – Looking Ahead • Independently assess and report on reliability and adequacy of the bulk power system • Events Analysis and Information Exchange – Looking Back for Lessons Learned • Analyze off-normal events and disseminate “lessons learned” to improve reliability performance • Benchmarking – How are we doing? • Develop reliability performance metrics, trends, and benchmarks – requires system measurements

  4. Program Scope • Investigate large-scale outages, disturbances, and near misses • Determine root causes and lessons learned • Identify and monitor performance to detect emerging trends and signs of decline in reliability performance • Communicate results, trends, recommendations, and initiatives to industry

  5. Events Under Investigation NERC “Action List” • Los Angeles – Sept. 12, 2005 • Blackout • Denver – February 18, 2006 • Rolling Blackouts • NYPA / Ontario – March 29, 2006 • Significant Generation Trip • ERCOT – April 17, 2006 • Rolling Blackouts

  6. Los Angeles – Sept. 12, 2005 • Design Alert – Generation Design • Undersized exciter power supply cables on Haynes Unit 10 – resulted in tripping of ~ 500 MW of generation • Turnkey project • Similar problems on sister units installed by same A&E firm • Review design (as built) of generators to ensure they can reach rated reactive power output

  7. Sample Alert

  8. Potential Studies for “Actions List” • Short-term demand forecasting • Contributory to 3 disturbances in 12 months • Generation forced outages • Weather-related • Protection / control system coordination

  9. Questions