1 / 3

The usual stages for certification include:

ISO/IEC TS 17025-5 Conformity assessment - Requirements for bodies providing audit and certification of management systems - Part 5 Competence requirements for auditing and certification of asset management systems . Accreditation Body ISO/IEC 17021 + ISO/IEC 17021-5 Certification Body

iokina
Download Presentation

The usual stages for certification include:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO/IEC TS 17025-5 Conformity assessment - Requirements for bodies providing audit and certification of management systems - Part 5 Competence requirements for auditing and certification of asset management systems. Accreditation Body ISO/IEC 17021 + ISO/IEC 17021-5 Certification Body ISO 55001 Organization

  2. The usual stages for certification include: Sales meeting between certification body and client organization Stage 1 initial evaluation audit Stage 2 Full evaluation audit, which if passed leads to certification 5 x Surveillance audits, every six months, on parts of the management system After 3 years, a full re-evaluation audit, and a new certificate The initial draft of 17021-5 by the PC 251 Ad Hoc Group in 2012 contained a number of hard competency requirements. On learning about the Stage 1 audit, ISO/CASCO/WG39’s members were able to dilute many of these requirements by shifting them to being information requirements to be determined during the Stage 1 audit, for the planning of the Stage 2 audits It had been expected that a draft would be released for comment following the WG39 meeting in February. However, the Secretary of ISO/CASCO (ISO’s Policy Committee for conformity assessment) decided that the draft developed during the meeting was sufficient to go forward for ballot as it was.

  3. The ballot of the Draft Technical Specification (DTS) of ISO/IEC TS 17021-5 is being delayed until the Final Draft International Standards (FDISs) of the ISO 5500xs are ready, so that they can be conducted concurrently. The ballot will be conducted by ISO/CASCO. Members should contact their national standards body mirror process for ISO/CASCO to try to influence the vote on the DTS. The draft will be circulated to ISO/PC 251’s members for information only, at the same time.

More Related