1 / 4

PREPARING FOR THE SITE VISIT

PREPARING FOR THE SITE VISIT. ACCREDITATION DIRECTORATE. BEFORE THE VISIT. HEQC person responsible for each institution Names communicated to institutions Site visit dates Customising the schedule Liaison role and point of contact Coordinating the visit (HEQC)-

iola
Download Presentation

PREPARING FOR THE SITE VISIT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PREPARING FOR THE SITE VISIT ACCREDITATION DIRECTORATE

  2. BEFORE THE VISIT HEQC person responsible for each institution • Names communicated to institutions • Site visit dates • Customising the schedule • Liaison role and point of contact • Coordinating the visit (HEQC)- Panel, Additional documents, etc • Visits the institution (two weeks in advance)

  3. INSTITUTION’S RESPONSIBILITY • Arrange appropriate venues • Prepare documents and necessary data sets for display – (evidence) • Make arrangements with students, alumni, staff, management, and TP schools –(interviews) • Ensure – no unnecessary delays • Communicate schedule changes to the HEQC

  4. DURING THE SITE VISIT DAY 1: READING DAY 2: INTERVIEWS DAY 3: INTERVIEWS DAY 4: REPORT WRITING

More Related