TDAQ news and issues. M. Sozzi NA62 TDAQ WG meeting CERN – 25/5/2011. Today’s meeting. Cables. Two solutions exist. Same halogen-free cable material (Madison). I2S (CERN-contact): 141.33 EUR/cable (6m), 12 wks for 400 cables

iorwen
Download Presentation

TDAQ news and issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDAQ news and issues M. Sozzi NA62 TDAQ WG meetingCERN – 25/5/2011

  2. Today’s meeting

  3. Cables Two solutions exist Same halogen-free cable material (Madison) • I2S (CERN-contact): 141.33 EUR/cable (6m), 12 wks for 400 cables • Needs reworking at CERN for reversing shell case (more time) • No prototypes (of the halogen-free version) availableMOQ: 200 cables • TCC: 160-185$/cable (6m),price depends on quantity4 wks for 400 cables • Prototypes availableMOQ: 1 cable

  4. TDCB future The engineer who took over the TDCB project left Firmware mostly complete, needs extensive testing V5 TDCBs (and cables) will be made available for purchase to sub-detector groups for assessment. Groups should arrange testing setup (with TELL1s) Produce up to 14 V5 boards: RICH: validation in Perugia (M. Piccini)LAV: validation in Frascati (M. Raggi) CEDAR: validation in Birmingham (A. Romano)STRAWS (fallback): validation in CERN (A. Sergi)MUV: ?CHANTI: ?SAC/IRC (if used?): ?

  5. TELL1 / TEL62 5 more TELL1 available (on loan) - CERN: - Mainz:- Napoli:- LNF:- ? Ordering of TEL62: - Roma Tor Vergata 1 ?- LNF 3 ?- Perugia 2 ?

  6. To do (reminder) • TTC network installation (fibres & splitters ordering) • TTC diode replacement (tests)? • Ordering of TDCB (up to 12 total) + cables • TDCB sub-detector validation tests • Crates validation • TELL1 radiation tests? • Ordering TEL62 (up to 10 total), manifacturing of GbE cards • TEL62 sub-detector validation • Common eth data-transfer software layer ?

  7. 4 main issues in front of us • TEL62 firmware:Pisa will drive the effort butmanpower issuesmissing involvement from many sub-detectors • LOTP: SW responsibility FerraraHardware responsibility ?Plan ? Milestone: demonstrator at end 2011? Dedicated meeting pending… • Online software: Re-use part of existing CERN (LHCb ?) softwareCoordination & plan ? • L1 (& L2) rejection: More RICH? Other sub-detectors?Straws usable? (do we need fine time at L1? how fine?)

  8. Getting real ? Need to define goals & plans for (1) dry run (spring-summer 2012) and (2) test run (fall 2012) The NA62 charged hodoscope?