1 / 5

News and Issues for FNAL BT

News and Issues for FNAL BT. S. Uozumi Apr-10 2008 ScECAL meeting. Flat cables. We have requested : Cables with almost same or simpler structure than ones we have used at DESY BT, but longer (1~1.5m), more robust (especially around connector), and cheaper! 240 cables + 5~10% spare

lavender
Download Presentation

News and Issues for FNAL BT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News and Issues for FNAL BT S. Uozumi Apr-10 2008 ScECAL meeting

  2. Flat cables • We have requested : • Cables with almost same or simpler structure than ones we have used at DESY BT, but longer (1~1.5m), more robust (especially around connector), and cheaper! • 240 cables + 5~10% spare (120+spare each for left and right-handed layout) • News from Repic : • Making cables up to 3 m is possible, but may take some time and money. • Structure around the connector is improved, therefore we will have no dead channels any more. • Num. of layers structure has been simplified to reduce production cost. • Delivery time and price are under estimation.

  3. Available MPPCs • Necessary amount : 2160 + spare = 2270 ~ 2490 • 72 channels in a layer • For 30 layers, 72 x 30 = 2160 + 5~10% spare necessary • Available MPPCs : ~ 2300 (quality not yet precisely checked) • 1500 will be delivered from Hamamatsu • 160 from KNU • 450 on flat cables in Japan (Shinshu, Kobe, KEK) • 190 unused in Japan (Tokyo, Shinshu, Tsukuba) • About 2300 pieces available in total • We may somehow have necessary amount + 5% spare if there is completely no trouble with re-soldering. • However still better to keep 6 cm strip option ? • With 6 cm strips, we will just need 1620 + (80~160) MPPCs. • Is it really hopeless to buy 100~200 more pieces ?

  4. How we cover the scintillator strips? A couple of ideas : • White paint on edge (or something better paint or tape), and put reflector sheet on top and bottom. • Easy to do even for 10-million strips at actual ILC detector. • Performance has been checked at KEK BT. • White paint on edge may affect to light yield. • May have optical X-talk between neighboring strips ? but actually at KEK BT we saw no large X-talk with white separator… • Completely wrap the strips with reflector sheet • May give the best light yield. • Wrap tightly may be difficult, resulting to have some space between scintillator and reflector? • Need to wrap 2200 strips, we will do the same thing for 10 millions? • Better to check with a bench-test to see difference of light-yield and amount of X-talk ?

  5. All collected events MIP events X-talk KEK BT result 2. extruded TiO2 good matching 3. extruded reflector bad matching 4. extruded reflector good matching 1.extruded TiO2 No fiber 6. Kuraray reflector thickness:2mm 7. Kuraray reflector 5. extruded TiO2 8. Kuraray reflector Signal (ADC counts)