An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HV-LV & DCS Status • DCS barrel: G. Polese and P. Paolucci • DCS endcap: A. Cimmino and P. Paolucci • HV & LV: D. Lomidze and P. Paolucci NEWS • DCS Endcap Prototype ver. 0.1 ready see Anna talk • DCS Barrel Prototype ver. 0.4 ready see Giovanni talk • RPS DCS integration will be in the next 3 weeks • HV-LV test setup is going on at BLG 904 P. Paolucci - I.N.F.N. di Napoli

  2. HV-LV status • First batch has been delivered at CERN (Jan 06)  send at BLG 904 this week • Test station for LV boards at BLG 904 under construction (PC, cable…..) • HV boards are under test in Napoli • Second batch in middle of Feb 06 • Ready for Cosmic Challenge in March 06 • No problems seen up to now (2 BC and 6 boards) • Lomidze will be at CERN for the final test for CC. P. Paolucci - I.N.F.N. di Napoli

  3. DCS status I • We are ready to release the first version of the Endcap DCS and the third version of the Barrel DCS. • They will be integrate in the CMS DCS in the next weeks. • More developing and test will be done before the Cosmic Challenge using the final HD setup in Napoli and at BLG 904. P. Paolucci - I.N.F.N. di Napoli

  4. RPC DCS status II • After the Dec 05 meeting we decide to reorganize the RPC monitoring group involving a more RPC oriented person in the LB monitoring. • We are in touch with Tuure for a phd position for G. Polese with a doctoral position at CERN. • Giovanni will work on PVSS (with Anna and myself) and XDAQ monitoring (with Warsaw people and myself). • It is very important to integrate him as soon as possible in the XDAQ project. P. Paolucci - I.N.F.N. di Napoli

  5. Next Steps • We need a meeting with Endcap and Barrel people about the DCS-HV-LV plan for the Cosmic Challenge where to define how many EASY crate, boards…..we want to use. • Order 48V AC/DC converts (budget ??) • G. Polese will be at CERN for 2 months • A. Cimmino at CERN for 3 weeks now and than in March for the final DCS test P. Paolucci - I.N.F.N. di Napoli