1 / 22

DCS Status of TRD

DCS Status of TRD. G. Tsiledakis University of Heidelberg. R. Bramm, T. Dietel, B. Doenigus, D. Emschermann, T. Krawutschke, C. Lippmann, J. Mercado, K. Oyama, B. Schockert, K. Schweda, J. Steckert, M. R. Stockmeier. DCS Workshop-ALICE Week CERN, Monday 9 October 2006. TRD at CERN.

mrinal
Download Presentation

DCS Status of TRD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCS Status of TRD G. Tsiledakis University of Heidelberg R. Bramm,T. Dietel, B. Doenigus, D. Emschermann, T. Krawutschke, C. Lippmann, J. Mercado, K. Oyama, B. Schockert, K. Schweda, J. Steckert, M. R. Stockmeier DCS Workshop-ALICE Week CERN, Monday 9 October 2006

  2. TRD at CERN Fully operated after only 2 days of setup

  3. module MCM 6 planes TR-detector 18 channels chamber B=0.4T vertex max. 16 padrows 5 module rings 8 MCM  144 channels 18 sectors in azimuth r  z TRD structure • Radius from 2.5 m - 3.7 m • Length 7 m • 18 Super Modules • 540 Chambers (720 m2) • 4.104 ReadOutBoards • ~70.000 MultiChipModules • 1.200.000 Channels

  4. Detector Control System (DCS) DCS controls/monitors: • Low Voltage (LV) • High Voltage (HV) • Front-end electronics (FEE) • Gas/Cooling • Pre-trigger system • Power distribution box for dcs-boards Hardware view

  5. Low Voltage • 5 power supplies : Wiener/PL512 • Control by OPC server or SNMP (Ethernet) • PVSS basic operation ready for 1stSM • LV is in use at CERN at SXL2

  6. Operation panel for LV

  7. Operation panel for LV Failure Max Current Failure Max Sense Voltage Failure Max Term. Voltage Failure Min Sense Voltage diagnostics settings

  8. Operation panel for LV read actual values V, A

  9. HV - ISEG PVSS panel for layer 0 -Input for HV distribution system by University of Athens • OPC V4.02: switching on/off • individual channels is OK • Peak CAN USB adapter • works fine

  10. HV Distribution System • 8 Anode + 8 Drift assembled cards • 10 auxiliary power supply cards with 3 transformers/card • 3 backplanes (one spare) • 2 crates • Markouizos, A. Mantzaridis, P. Mitseas, A. Petridis, • S. Potirakis, M. Tsilis, M. Vassiliou University of Athens

  11. HVDS test on the TRD

  12. HVDS output stability U (mV) 1600 V with resolution of 30 mV (overnight measurements) t (s)

  13. PVVS-Inject FED Server InterCom Layer FEE Client • Commands sent from PVSSFEE Server Using InterCom/Config/FEE Server for ROC tests • Problems with logging in PVSS • Further development is ongoing… FEE Server FEE Server FEE Server FEE Chain (3 Layers) PVSS (DIM - Client) #1 User: 1 PVSS/FSM #2 Intermediate: 1 InterCom + DB #3 540 DCS boards 8(6) ROBs each: ControlEngine / FeeServer Config. DB CommandCoder

  14. FEE testing panel

  15. Gas controls • Gas system will be controlled by PVSS panels that talk to the PLC. • Software was developed by IT/CO and now is debugged and tuned by the gas working group • Goofie (drift velocity, gain, gas composition)  via a DIM server to a machine where the DCS can retrieve them via PVSS • Common effort with the TPC team C. Garabatos, U. Frankenfeld

  16. Cooling The (prototype) C&V Framework component is used • Provides simple common panels for development and debugging in Device Editor and Navigator • The SCY file which contains data about the variables in the PLC has just been provided for TRD • After the C&V tool is working it will be integrated into a FSM control panel • Functionality and understanding of SCY file is in progress… • Soon connection with hardware A.Tauro, M. Dos Santos, G.De Cataldo

  17. Open Issues • Low Voltage • Supervision behavior exists but is not controlled by PVSS bug in the framework reported to JCOP… • ramp speed changed from 100 V/s to 1 V/s via USB  needs to be part of PVSS !

  18. Open Issues • High Voltage • Using bit masking to switch ON/OFF the channels in OPC V4.10 is ok, but difficult to implement in PVSS • OPC V4.02 has the desired functionality (tests have started) • Frond-end electronics • Logging issues in PVSS

  19. Summary 1st TRD supermodule is operated above ground • LV: is in use at CERN • HV: OPC V4.02 is OK • FEE: basic functionality available, further development… • Gas/Cooling: provided components are tested… • PDB: first dcs-chain set up, work in progress… • FSM development in progress…

  20. layout of LV power rack for a single TRD Supermodule

  21. fwWiener PVSS framework component 6 LV supplies 18 channels 24 panels for the 1st supermodule • We need just 1 simple panel for operating everything

  22. HV • A special DCS Board Firmware is developed for the HVDS system Communication hierarchy

More Related