Slow control trigger of the muon arm (LV) DCS Muon trigger Gas ELMB HV LV VME CRATE INFN TORINO LPC CLERMONT F.Jouve & P.Saturnini DCS WORKSHOP CERN 6_7/10/2005
Slow control trigger of the muon arm (LV) • A General status • LV proto Ok with canbus opc server. • 1 crate:( 1 x 3.5 V & 1x -2 V channels) • VME proto crates ok (2 crates daisy chain tested). • FSM not yet implemented F.Jouve & P.Saturnini DCS WORKSHOP CERN 6_7/10/2005
Muon-Trg [FSM?] Database(s) PVSS II Control room (ACR) PVSS II PVSS II OPCclient DIMclient User interface Ethernet CR3 CR3 CR3 CR3 CR3 PVSS II PVSS II PVSS II PVSS II PVSS II OPC client OPC client OPC client OPC client DIP CAEN OPCserver Wiener OPCserver Wiener OPCserver ELMB OPCserver E E PCI-CAN PCI-CAN [GWG] ? 2 4 17 C C GasPVSS CR4-Z06 SG2 PLC SY1527 ACC ACC INFN TURIN E SG2 Gas UX-D UX-A,B,D VME(wiener) ELMB(I/O device) Wiener CR5 Gas HV LV Details? Efficiencysystem 16 4 ? ? 72 Detector Detector Detector Detector High Voltage Low Voltage Crate Control Environment monitor Gas system B. Overview Drawings
C. Equipment inventory 4 Wiener crates PL500/F12 17 Wiener VME crates 2 crates 2 crates 5 crates 5 crates 6 crates 1 crate ETHERNET BUS CAN BUS CAN0 CAN1 CAN0 CAN0 CAN1 CAN1 Canbus card SOFT OPC WIENER ethernet card Canbus card Rackable pc located in the counting room F.Jouve & P.Saturnini DCS WORKSHOP CERN 6_7/10/2005
Right side Power bins 0B15.1200 F R E E F R E E F R E E F R E E Rack D32 Slow control trigger of the muon arm (LV) Left side 3U Module OM 21.0004 (100 A/ch) F R E E F R E E F R E E F R E E Module OM 21.0002 (2ch;25 A/ch) SPARES Rack D3 F.Jouve & P.Saturnini DCS WORKSHOP CERN 6_7/10/2005
E Databases In progress….. The parameter table is defined Fixed values are being tuned. F.Jouve & P.Saturnini DCS WORKSHOP CERN 6_7/10/2005
F. Computer needs A B C A B C A B C Batch 1 Batch 2 Batch 3 Batch 1, which concerns only the central servers, has already been ordered. Batch 2 will be ordered in November 2005 to be installed and ready for use at P2 in February 2006. Batch 3 will be ordered in March 2006 to be installed and ready for use at P2 in June 2006. A: Basic Worker Node B: Extra screen required C: Extra configuration (e.g. more memory) G. Networking The default configuration is relevant. H. No specific questions F.Jouve & P.Saturnini DCS WORKSHOP CERN 6_7/10/2005