1 / 11

Summary of EMC-DTC Meeting

Summary of EMC-DTC Meeting. June 18, 2009. DTC AOP 2010. Tasks to be continued from 2009: WRF-NMM + WPP community support (Jamie Wolff) Reference configurations implementation (Jamie Wolff) GSI community support (Ming Hu ) HWRF community support ( Shaowu Bao )

ismet
Download Presentation

Summary of EMC-DTC Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of EMC-DTC Meeting June 18, 2009

  2. DTC AOP 2010 • Tasks to be continued from 2009: • WRF-NMM + WPP community support (Jamie Wolff) • Reference configurations implementation (Jamie Wolff) • GSI community support (Ming Hu) • HWRF community support (ShaowuBao) • HMT-DTC: verification of precipitation forecast, ensemble prediction and verification (Ed Tollerud) • HWT-DTC: Evaluation of cloud-resolving model predictions (Tara Jensen) • NAM-GFS precipitation forecast comparison (Jamie Wolff) • Pre-BUFR and BUFR data tool through DTC

  3. DTC AOP 2010 • Proposed New Tasks to be added: • NEMS software architecture: • Introducing NEMS to the community through organized NEMS workshop/meeting • Preparation for transition to NEMS-based NAM system • Hire DTC software engineer to work at EMC • Ensemble: • Verification of SREF forecasts • Test and Evaluation of different ensemble techniques • HFIP Demo system test and evaluation (LigiaBernardet and Louisa Nance)

  4. Summary of GSI Discussion • EMC and DTC will maintain two separate GSI repositories • Frequent syncing of community with EMC • Need to determine how libraries will be handled • User support • 1 release and 1 tutorial per year – staggered • Helpdesk assistance request – channeled through John Derber • First GSI tutorial class to be offered in September 2010: • 3 day tutorial followed by 2 day workshop • EMC staff will participate as lecturers and instructors (who TBD)

  5. Summary of HWRF Discussion • HWRF tutorial will be held in February 2010: • 2 day workshop followed by 3 day tutorial • Need to prepare for transition to NEMS based HWRF system

  6. HWRF code management plan

  7. Longer term • Support of SREF to the community: • EMC’s WRF-based SREF system is being transitioned to the NEMS-based system. • DTC should work with EMC to make the NEMS-based SREF system available to the community

  8. Follow-up • DTC Management: • DTC will work with NCEP/NWS to establish executive committee, management board, and advisory board. • DTC will prepare AOP2010 and budget for preliminary review by August 2009. • DTC-EMC collaboration: • Should have face-to-face meeting once every 3-4 months. • DTC staff will visit EMC twice a year. • Technical discussion through email and teleconference will be held as needed • Should establish point of contact for each collaborative effort (would also like to have “back-ups” POC).

  9. Mesoscale Ensemble Workshop • 23-24 September 2009 at NCAR Mesa Laboratory, Boulder. • Will invite ZoltanToth to serve as program committee member. • Need a presentation from EMC on NCEP’s plan on global and mesoscale ensemble.

  10. Visitor Exchange • Exchange of visitors: • DTC visitors at EMC: • GSI: HuiShao should be continued • NEMS: New software engineer • EMC visitors at DTC: • HWRF/HFIP: Naomi Surgi should be continued • GSI: Visitor protocol will be discussed and arranged • Suggest EMC establish a “sabbatical” system, to allow staff to spend significant amount of time in Boulder.

  11. Challenges • The presence of EMC at the WRF workshop • Suggest to encourage more EMC staff to participate in WRF workshop • Introducing NEMS to the broader community • NCAR/MMM’s participation in NEMS for both WRF-ARW and the new global model • How will this benefit the user community? • Feature comparison of NEMS and WRF framework. • DTC-MMM partnership in community user support • A formal separation of WRF-ARW and NEMS-NMM will lead to separation of user support. • Will the NEMS-based system get more “market share?” • Should we consider having EMC-DTC-MMM joint meeting on future community user support?

More Related