1 / 27

The PBE Process

The PBE Process. What is a PBE?. P reliminary B udget E stimate. University Facilities will work with you to assess your needs, determine the scope of work and create a preliminary budget estimate (PBE). How do I begin?.

ita
Download Presentation

The PBE Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The PBE Process What is a PBE?

  2. Preliminary Budget Estimate University Facilities will work with you to assess your needs, determine the scope of work and create a preliminary budget estimate (PBE)

  3. How do I begin? The Facility/Business Manager for a Department/Unit may initiate the PBE process by contacting University Facilities via email projects@drexel.edu

  4. Email to: projects@drexel.edu • Project Location • Brief Description • YourContact Information

  5. The PBE Process What happens next?

  6. PBE # assigned • Designer/Engineer assigned • Initial meeting held • Feasibility review completed • Programming & design scope developed • PBE document is prepared

  7. Which Includes… • Coordination of interior design services (FF&E) • Environmental Health and Safety (EH&S) • Outside estimators • MEP/FP • IRT • Public Safety • Housekeeping • Moving • Maintenance • And other participants as required.

  8. The PBE is sent to the requestor for approval & funding. Once funded, the project can be implemented.

  9. The PBE Process What are the results?

  10. Facilities Management Drexel University

  11. Programs • Shipping & Receiving • Campus Moves • Event Preparation • Shuttle Service / Bus Transportation • Recycling Services • Fleet & Vehicle Maintenance

  12. Campus Maintenance • Maintenance Operation / Shops • Mechanical & Operation System • Custodial Services • Ground Services • Snow & Ice Removals • Solid Waste Removals

  13. Shipping & Receiving • Shipping & Receiving receives 800 to 2,400 parcels a day • Material Deliveries Parcels, Freight, and Project Building Material • Parcels and small freight delivered daily • Freight Commercial Vehicle for Deliveries • Project Material / Deliver and Install • Delivery Process / Tack Pad Receipt System

  14. Campus Moves • Furniture or bulk material moves • Moves that are not preformed by Facilities Management: One Drexel Plaza, Creese Student Center, MacAlister Hall, Daskalakis Athletic Center, and Residence Halls (UNICCO) • Event Preparation 215 895 2520 www.drexel.edu/eventservices

  15. Shuttle Service / Transportation • Transportation Bulk Material • Package Deliveries • Off Campus Transportation • Bus Charters • Campus Bus Services • Disability Services

  16. Recycling Service • Paper • Cardboard • Toner & Printer Cartridges • Glass / Metal Cans • Furniture • Hazardous Waste Recycling

  17. Work Order System • Yardi System Inc. • Facilities Management Extension #1700 • Email facilities@drexel.edu • Facilities Management Web Page • Maintenance / Custodial Request • Union Labor (Teamsters Local 115)

  18. University Procurement215-895-2876 Fax 215-895-2877 • Joe Campbell – 215-895-2807 • Anna Griffin – 6432 • Charlene Rice – 2921 • James Davis – 6430 • Carmen Spears – 2780 • UnaMassenburg – 6433 • Michele Arias-Ramos 6431 • Kathleen Maertzig – 5847 • Debbie Rizzo – 6132

  19. Goal • To assist faculty and staff in obtaining timely, high quality products and services at the best price. • Stay in line with standards to develop leverage with manufacturers for deeper discounts.

  20. Preferred Furniture Vendors • Alpha • Bellia • Corporate Facilities Inc.(CFI) • Covington • Educational Furniture Solutions (EFS) • Pomerantz • WB Mason • Wright Line • VWR • Fisher

  21. Bid/Quote Requirement • Contact Procurement/Vendor • Orders in excess of $2,500 but less than $5,000 require 1 additional quote • Orders in excess of $5,000 require three(3) written quotes including 1 from chosen vendor. Installation charge should be indicated on quote as a separate item Exceptions • Additional quotes are not required for orders under $5,000 if using our preferred vendors • Additional quotes are not required if products are on a higher education contract (E&I, US Communities)

  22. Furniture Closeout Form • Name of vendor your order was placed with? • When did you place your order? • Was delivery of products on time? • Were you satisfied with the installation? • Would you order from this company again?

  23. Questions • ? • ? • ? • ? • ? • ? • ? • ? • ?

More Related