Presented by Wouter van de Bund, this meeting addressed open issues and proposals for intercalibration planning for river GIGs. Discussions included methods, reference conditions, and large river pressures. Participants focused on macroinvertebrates, phytobenthos, macrophytes, and fish, aiming to improve comparability and methodological consolidation.
E N D
River GIGs: Future intercalibration needs/plansPresented byWouter van de BundJoint Research CentreInstitute for Environment and Sustainability
Intercalibration status – River GIGs green – finalised results; red – not completed in current exercise • Macroinvertebrates completed • Phytobenthos completed for most GIGs • Macrophytes and Fish in progress • Horizontal open issues: • RC setting • Large rivers
Participants: lead persons and steering group members of all river GIGs for all QE Purpose of the meeting: identification of open issues and making proposals how to address them By quality element Horizontal issues Minutes distributed to ECOSTAT River Intercalibration planning meetng – Lissabon 15-16 January 2008
Common open issues: how to deal with new and updated methods reference conditions intercalibrating methods aimed to detect effects of hydromorphological pressures large rivers GIG specific issues: NO, CB GIG: Acidification In progress in NO; CB GIG will draw from NO experience EC GIG: Applying results to all MS (EC GIG) New GIG lead: CZ Anticipate problems with funding of the work Macroinvertebrates
Limitations of the current results: RC and boundary setting comparability could be improved Combining phytobenthos result with macrophyte results at QE level (‘official’ QE is phytobenthos AND macrophytes) Phytobenthos
Work in CB GIG ongoing following the agreed plan (meeting next week) Other GIGs: macrophyte IC not started yet Will wait for CB work to be completed (2008) Will make plans taking advantage from CB experiences Macrophytes
Need to consolidate and publish the IC methodology: Papers in scientific literature by QE in preparation Step-by-step instructions for new and updated methods (as required in Guidelines) in preparation Horizontal issues: IC methodology
General agreement (in IC reports) that RC setting can and should be improved First need to consolidate current state of work 3-step plan: Stabilize the concepts Harmonize the criteria (QE, GIGs) Quantify the thresholds : search of "no effect" thresholds (this requires data analysis – we need concrete examples / case studies Proposal that GIG leads/steering group produce two discussion papers during the spring as a concrete starting point of work in the GIGs (lead: J.-G. Wasson, FR) Horizontal issues: Reference conditions
GIGs need to update the planning sheets according to the outcome of the discussions (mostly minor) If the proposed apprach is agreed by ECOSTAT, the GIG leads/steering group will proceed producing the papers as proposed during the spring Large river expert meeting (involving all MS/GIGs) planned for this autumn to discuss the way forward JRC will ask to (re)confirm the MS nominations for the various river GIG groups (some of the lists are outdated) Proposed way forward