Summary of FMS/Jet Meetings. August 21 2014. FMS Meeting: 8/18/14. No formal presentations: PSU delivered 508/684 bases South FMS is 83% stacked/50% cabled (3 weeks) North FMS is 3 % stacked (1 day) Work has begun on West DX/vacuum line Preshower received SiPMTs ZiLong Chang
E N D
Summary of FMS/Jet Meetings August 212014
FMS Meeting: 8/18/14 • No formal presentations: • PSU delivered 508/684 bases • South FMS is 83% stacked/50% cabled (3 weeks) • North FMS is 3% stacked (1 day) • Work has begun on West DX/vacuum line • Preshower received SiPMTs • ZiLong Chang • Keith Landry JET Meeting: 8/19/14
ZiLong Chang: Run12 Inclusive Jet ALL Update: Anti-kT R=0.6 https://drupal.star.bnl.gov/STAR/system/files/Run12_aLL_Updates.pdf
ZiLong Chang: Run12 Inclusive Jet ALL • Presented 2012 ALL results • Broke down results in triggers JP0/JP1/JP2 • Used 2011 embedding sample to calculate: • Comparison of pT Spectra for JP0/JP1/JP2 • Computed pT shifts for each trigger/combination (parton jet-detector jet) • Determined pT shifts for LSS10p model • Summary: possible problem with match of detector to parton jets. Will try Anti-kT R=0.5
Keith Landry: 2009 IFF Analysis Pion Fraction vs Pseudo-rapidity 3D plots of AUT vs Mass and pT https://drupal.star.bnl.gov/STAR/system/files/jetMeetingUpdate819.pdf