An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metrology of the Stave250 Assembly Jig (Tim)

  2. What do we need to measure?

  3. Procedure • Measure PH2 and define as (0,0) • 4 point: DIA=0.043 / CIRC=0.001 • Measure PH1 and define PH2-PH1 as primary axis • 4 point: DIA = 0.063 / CIRC=0.001 • Distance PH1-PH2 = 1247.520 • Measure front edge of 14 Vee-blocks at 4 points along length (See plot) and reconstruct line of best fit • Y=-42.228 + 1.5738x10-4 X • Measure Tooling ball • (1248.586,-119.685): DIA=8.207 / CIRC=0.011

  4. Vee Blocks

  5. CAD Analysis

  6. CAD Analysis

  7. Comparison with SmartScope • Procedure • Mount jig on Smartscope& reconstruct lines along the edges of the Vee blocks (sub-stage illumination). Construct datum axis • Measure tooling ball as a composite of 3 sub-circles • Diameter = 8.209 / CIRC = 0.0186 • Measure PH1 as a composite of 3 sub-circles • Diameter = 0.0287 / CIRC = 0.0015 • Measure distance from Tooling ball to PH1 parallel to Vee-block datum axis • 1.0765 – Diameter/2 = -3.028 • Measure PH1 offset to Vee-block axis • 42.040

  8. Vee-blocks (CMM vsSmartScope)

  9. CMM Survey with Back-lighting • Pin-holes and tooling ball measured with back-lighting to try and improve measurement • Hi-tec torch (Wifi/3G enabled) • Results • Pin-holes • 0.028 / 0.030 mm with 4-point circularity of 0.001mm • Tooling ball • 8.205mm with 20-point circularity of 0.025mm

  10. Comparison of CMM Vee-block alignments

  11. Survey with 4mm dowels (CMM#3) • 4mm dowels held into Vee blocks with tool-makers clamps. • Inner edge of dowels reconstructed using back illumination via reflection from aluminium.

  12. Comparison of Vee-block surveys • NB 4mm dowel data offset by +3.40 mm

  13. Summary