140 likes | 348 Views
Falgout Canal Floodgate Structure Unbalanced Forces and Proposed Solutions. October 2013. Falgout Canal Floodgate Structure . Status Project is in preliminary engineering phase Estimated completion is mid November 2013 Meeting Goals Present findings of unbalanced load calculations
E N D
Falgout Canal Floodgate Structure Unbalanced Forces and Proposed Solutions October 2013
Falgout Canal Floodgate Structure Status • Project is in preliminary engineering phase • Estimated completion is mid November 2013 Meeting Goals • Present findings of unbalanced load calculations • Discuss proposed methodology of engineering structure to accommodate unbalanced forces • Receive feedback from CPRA & proceed with preliminary design
Falgout Canal Floodgate Structure Unbalanced Force - Landing Structure
Falgout Canal Floodgate Structure Unbalanced Force in Landing Structure
Falgout Canal Floodgate Structure Slope/W Analysis
Falgout Canal Floodgate Structure Site Plan
Falgout Canal Floodgate Structure Group 2013 Analysis
Falgout Canal Floodgate Structure • Global Stability Analysis • Calculate factor of safety and failure surface using vertical water pressure only • Apply a resisting force until factor of safety meets criteria • Design Structure to Resist Unbalanced Load • Option 1 – Widen barge structure (Analyzed in Slope/W) • Option 2- Use cutoff wall, landing piles and receiving structure together (Analyzed in Group 2013 by Ensoft)
Falgout Canal Floodgate Structure Unbalanced Forces Outline • Analyze global stability for SWL • Determine unbalanced force and failure plane EL • Perform preliminary design of gate landing foundation and receiving structure w/o unbalanced forces • Apply unbalanced force to gate landing foundation • Unbalanced force resisted by gate foundation alone • Apply static hydraulic forces to receiving structure w/o soil above failure surface • Hydraulic force resisted by receiving structure alone • Apply unbalanced force and hydraulic force to combined gate foundation and receiving structure • Unbalanced force + Hydraulic force resisted by gate foundation and receiving structure together
Falgout Canal Floodgate Structure Unbalanced Force
Falgout Canal Floodgate Control Structure Analyses Summary
Falgout Canal Floodgate Control Structure • Unbalanced force can be resisted by cutoff wall combined with landing piles together • Hydraulic force can be resisted by the receiving structure • The connection of the cutoff wall and the landing piles together and the transfer of forces between the landing foundation and the receiving structure is by a pile cap at landing piles and/or through the gate structure. Conclusion