Toward Production Inspection of the LH 2 Absorber Window

Toward Production Inspection of the LH 2 Absorber Window. John Greenwood, Fermilab Alignment & Metrology Group. Premise . Some day all of the testing will be completed and a cooling channel will be built. Premise .

jeff
Download Presentation

Toward Production Inspection of the LH 2 Absorber Window

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Toward Production Inspection of the LH2 Absorber Window John Greenwood, Fermilab Alignment & Metrology Group MuCool October 22, 2002

  2. Premise • Some day all of the testing will be completed and a cooling channel will be built. MuCool October 22, 2002

  3. Premise • Some day all of the testing will be completed and a cooling channel will be built. • Among other devices, the LH2 Absorber Windows will require pre-installation inspection. MuCool October 22, 2002

  4. Premise • Some day all of the testing will be completed and a cooling channel will be built. • Among other things, the LH2 Absorber Windows will require pre-installation inspection. • You are invited to consider some of the issues associated with production inspection and certification of these parts. MuCool October 22, 2002

  5. Among the issues to be determined… • How many Windows will be built? • 20 • 100 • >200 MuCool October 22, 2002

  6. Among the issues to be determined… • How many Windows will be built? • 20 • 100 • >200 • Will all units be inspected or just a sampling? • If just a sampling, what selection criteria? MuCool October 22, 2002

  7. Among the issues to be determined… • How many will be built? • 20 • 100 • >200 • Will all units be inspected or just a sampling? • If just a sampling, what selection criteria? • Expected production rate? • Units/month • Size of batch MuCool October 22, 2002

  8. More issues… • Will the inspection be – • Static? • Conformance to design • Both convex and concave surfaces MuCool October 22, 2002

  9. More issues… • Will the inspection be – • Static? • Conformance to design • Both convex and concave surfaces • Dynamic? • Pressurized to ??? psi • Number of epochs MuCool October 22, 2002

  10. More issues… • Will the inspection be – • Both Static and Dynamic • Conformance to design for both convex and concave surfaces • Pressurized for several epochs to ??? psi MuCool October 22, 2002

  11. Still more issues… • Special facilities will be needed • Must be clean, stable, dedicated • For how long? MuCool October 22, 2002

  12. Still more issues… • Special facilities will be needed • Location? • Fermilab • NIU • Other MuCool October 22, 2002

  13. Still more issues… • Special facilities will be needed • Location? • Who will do inspection? • Fermilab Alignment & Metrology Group • NICADD • 3rd party MuCool October 22, 2002

  14. Inspection • Surface preparation • < 20 units, Met-L-Chek • > 20 units, or measuring thickness/eccentricity, use a production coating such as TiO2 MuCool October 22, 2002

  15. Inspection • Surface preparation • Go, No Go criteria • What constitutes an “in” tolerance part? • What constitutes an “out” of tolerance part? • Can these be salvaged? • Remediation issues • Are “in” and “out” the same? MuCool October 22, 2002

  16. GD&T!!! • Geometric Dimensioning & Tolerancing – ASME Y14.5M 1994Standard • Datum Reference Frame (DRF) simulation– an abstraction of part features MuCool October 22, 2002

  17. DRF features • Position of 6 precision 0.125” (+0.0005, -0.0000) holes, plus one indicator hole, on convex-side flange surface • Describes • Flange plane • Window center • Window orientation MuCool October 22, 2002

  18. Window DRF – Button targets Targets MuCool October 22, 2002

  19. Window DRF – Plane Plane constructed from projected dots on flange face MuCool October 22, 2002

  20. Window DRF – Circle Best-fit circle constructed from button targets projected on flange plane MuCool October 22, 2002

  21. Window DRF - Clocking XY plane = flange plane, +Y toward button near clocking mark MuCool October 22, 2002

  22. DRF features… • If thickness is to be measured, a second set of holes will be required on concave-side flange surface MuCool October 22, 2002

  23. Photogrammetry Non-contact Fast Many data points Slightly less accurate than best CMM CMM Contacting Slow Sparse coverage Higher accuracy Current inspection tools MuCool October 22, 2002

  24. Best current practice • Combination of CMM + V*STARS • Using CMM to coordinate 6 target holes on flange face • Produces a stable, accurate DRF – plane, point, orientation • V*STARS “attaches” to DRF features for scale and orientation • Simplifies photogrammetry setup • Enhances accuracy • Provides cross-check • Considered as mandatory if thickness and/or eccentricity is to be measured MuCool October 22, 2002

  25. Surface modeling • SPSF (Small Patch Sphere Fit) • Is it useful for new Window shape? • Other options • Kotem Technologies’ SmartFit • MayaMetrix MuCool October 22, 2002

  26. New window shape MuCool October 22, 2002

  27. Inspection tools of the future • Laser CMM in 3-5 years • < 100 nm @ << 1ms/point on small parts (5-10 cm) • Full surface mapping in < 60 seconds • Current development under DOE SBIR MuCool October 22, 2002

  28. NLC Copper Structure Copper discs MuCool October 22, 2002

  29. Summary of objectives • Process must… • Efficiently manage production inspection and documentation • Simplify the process to the extent possible • Insure confidence MuCool October 22, 2002