1 / 9

Progress Report of Planning Interconnection Sub Working Group Presented to

Progress Report of Planning Interconnection Sub Working Group Presented to The 8 th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia 6 th October 2010 by Dr. Thana Boonyasirikul. Related Meeting Events (2009-2010). The Meeting of APGCC#5 & HAPUA WC#11

jennis
Download Presentation

Progress Report of Planning Interconnection Sub Working Group Presented to

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report of Planning Interconnection Sub Working Group Presented to The 8th Meeting of HAPUA Working Group No.2 - Transmission Kuala Lumpur, Malaysia 6th October 2010 by Dr. Thana Boonyasirikul

  2. Related Meeting Events(2009-2010) • The Meeting of APGCC#5 & HAPUA WC#11 • (9-11 November 2009, Chiang Mai, Thailand) • Presented the generation results of AIMS-II based on the input of 11 September 2009 • The Meeting of PI SWG - Transmission Team #2 • (1-3 December 2009, Bangi, Malaysia) • Set up the Transmission Study Methodology • The Special Meeting of PI SWG - Transmission Team : Sub System A • (29 December 2009, Udon Thani, Thailand) • Transmission analysis was partially done for selected years • Transmission data of Laos System were received • Agreed to simplify transmission data of Myanmar and Vietnam • The Meeting of PI SWG - Transmission Team #3 • (3-4 March 2010, Bandung, Indonesia) • Discussion on preliminary results of Power System Study • Agreed on minor changes of criteria and assumption on Power System Study • Updated APGCC Work Plan • The Special Meeting of WG2:Transmission-PI SWG (Discussion on AIMS-II) • (28 June 2010, Petchburi, Thailand) • Key Finding and Issues of AIMS-II Generation Report • Discussion on AIMS-II Transmission • Results of the Steady State and Dynamic Simulation

  3. Works Accomplished and Outcomes Completion of AIMS-II * Report on Generation System Study was circulated to Member Countries on 24 May 2010 * Minor corrections were made upon member comments and resubmitted to all members on 14 September 2010 * Member countries accepted AIMS-II results and reports prepared by PI SWG. * Submission of AIMS-II Final Results to member countries on November 2010 * AIMS-II can be used as a reference for implementation by concerned parties. Further studies are required to be carried out as necessary. Conclusions and Recommendations -The study indicates a saving of 788 MUSD with ASEAN interconnection network which is based on the data dated 29 September 2009. - It is noted that the nature of input for AIMS-II study is dynamic. The result should be referred to the date of data availability. - The final AIMS-II report shall be composed of 4 reports, Generation System Study, Transmission System Study, Appendix and Executive Summary.

  4. Work Plan for AIMS-II Report 4

  5. Findings from the 4th Meeting of PI SWG • Issues to be completed by a week after the 4th Meeting • * The PI SWG Leader requested all member countries to provide the statistical data of peak demand (MW) and energy demand (GWh) for the first 6 months of 2010 to Thailand delegate for the data collection. • Issues to be examined by a week after the 4th Meeting • Assumptions for Energy Price/Fuel Price shall be examined/identified to be put in the generation study report • AIMS – II Report Structure is changed to: • Volume I – Executive Summary • Volume II – Generation Study Report • Volume III – Transmission Study Report • Volume IV – Appendices • - Terms of Reference - Power Interconnection Sub working Group • - Work Plan of Power Interconnection Sub Working Group • - Power Development Plans of ASEAN Member Countries • - Power Flow/Stability Diagrams (hard copy / CD files) 5

  6. Future Work Plan Harmonization of Reliability Criteria for ASEAN Countries Discussion on reliability criteria and data requirement for Planning Criteria Establishment of common reliability criteria and assumption Data collection and implementation Applicable Not Applicable Amendment and fine-tune Discussion on harmonization and validation of results Comparison reliability criteria among ASEAN countries Establishment of reliability criteria for the benchmarking of planning criteria among ASEAN countries 6

  7. Tentative Schedule Harmonization of Reliability Criteria 7

  8. Tentative Schedule Harmonization of Reliability Criteria 8

More Related