An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE INTRIGUING BEHAVIOUR OVER TIME OF PD'S FROM DEFECTS IN MV CABLES AND ACCESSORIES LESSONS LEARNED WITH SCG, an on-line monitoring system E. Fred Steennis on behalf of E.Fred Steennis – Netherlands – Session 1 – Paper 0875

  2. Content • how to measure PD’s on-line in MV cables • some results • lessons learned – the intruiging behaviour of PD’s • conclusions

  3. Content • how to measure PD’s on-line in MV cables • some results • lessons learned – the intruiging behaviour of PD’s • conclusions

  4. up to 8 km CU SIU How to measure PD’s on-line • applied method = SCG • SCG means: Smart Cable Guard

  5. How to measure PD’s on-line • with SCG • diagnose cables (≤ 8 km) • data via internet to KEMA server, 1 h updates • customers have accessto their PD plots • KEMA experts recom-mend on action if needed

  6. Content • how to measure PD’s on-line in MV cables • some results • lessons learned – the intruiging behaviour of PD’s • conclusions

  7. Some results 4 days PILC of 666 m with water at 396 m

  8. Some results 3 weeks XLPE cable of 4.3 km with joint at 1678 m

  9. Some results > 4 weeks XLPE cable of 7 km with various weak spots

  10. Some results top view 3 months PILC of 2.2 km with liquid filled joint at 1794 m

  11. Content • how to measure PD’s on-line in MV cables • some results • lessons learned – the intruiging behaviour of PD’s • conclusions

  12. Lessons learned – PD’s are intruiging How effective is SCG? 4 years SCG 158 km cable monitored 41 defects found in 7 cases (17 %) : no PD at all in 34 cases (83 %) : clear PD activity and time to act SCG is effective in warning for upcoming failures

  13. Lessons learned – PD’s are intruiging SCG . . . . how much time for repair?

  14. Lessons learned – PD’s are intruiging SCG . . . . how much time for repair? water in PILC joints with hot conductor screen interruption in XLPE liquid filled joints in PILC

  15. Lessons learned – PD’s are intruiging SCG . . . . how much time for repair? water in PILC: days*) joints with hot conductor screen interruption in XLPE liquid filled joints in PILC *) between start of heavy PD activity and failure

  16. Lessons learned – PD’s are intruiging SCG . . . . how much time for repair? water in PILC: days*) joints with hot conductor: days*) screen interruption in XLPE liquid filled joints in PILC *) between start of heavy PD activity and failure

  17. Lessons learned – PD’s are intruiging SCG . . . . how much time for repair? water in PILC: days*) joints with hot conductor: days*) screen interruption in XLPE: weeks*) liquid filled joints in PILC *) between start of heavy PD activity and failure

  18. Lessons learned – PD’s are intruiging SCG . . . . how much time for repair? water in PILC: days*) joints with hot conductor: days*) screen interruption in XLPE: weeks*) liquid filled joints in PILC: months - years *) *) between start of heavy PD activity and failure

  19. Content • how to measure PD’s on-line in MV cables • some results • lessons learned – the intruiging behaviour of PD’s • conclusions

  20. Conclusions SCG can diagnose PILC, XLPE or mix up to 8 km, with 1 % length accuracy exp. so far: 4 years; 158 km monitored effective to see defects on time: 83 % ! PD’s from many types of defects only visible for a few days before the failure, in others cases there is (much) more time SCG most effective if monitoring over longer time

  21. THANK YOU FOR YOU ATTENTION

More Related