A States Perspective of Biomass Power

A States Perspective of Biomass Power. U.S. EPA. 146 biomass energy projects* Independent Power Producers Power only CHP (IPPs) Industrial Commercial Electric utility 3962 MW. *Solid wood, agriculture byproducts & organic solids. IPP & utility power. 63 projects 16 states 1988 MW.

jerome
Download Presentation

A States Perspective of Biomass Power

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A States Perspective of Biomass Power

  2. U.S. EPA • 146 biomass energy projects* • Independent Power Producers • Power only • CHP (IPPs) • Industrial • Commercial • Electric utility • 3962 MW *Solid wood, agriculture byproducts & organic solids

  3. IPP & utility power • 63 projects • 16 states • 1988 MW *Solid wood, agriculture byproducts & organic solids

  4. Profiles • Massachusetts • Significant public challenges • Unfavorable policy • Vermont • RPS targets unmet • Vermont Yankee nuke • Public challenge • New Hampshire • Revised RPS • Large new facility • Maine • 5 existing plants, 3 yr contracts

  5. Profiles • Michigan • No RPS revisions • Rural development initiatives • Washington • Removes placed-in-service date • Expands eligible biomass feedstock • Oregon • Biomass fuel credit modification

  6. MASSACHUSETTS • RPS • 15% by 2020 (new sources) • 7.1% (existing sources) • 1%...’03; 5%...’10 plus 1% annually • 1997 placed-in-service date • Revisions proposed, yet to be released

  7. MASSACHUSETTS • Current status • 1 operating…18 MW • 0 closed • 0 new/under construction • 3 planned…135 MW • 0 terminated

  8. MASSACHUSETTS • Obstacles • Proposed RPS revisions • Wood = thinnings, storm salvage, sanitation; • 15% by weight max. of harvested • GHG reduction of 50% over 20 years; • Efficiency requirements • 40% = half REC, 60%-plus = whole REC • Existing plants comply by 2013, all by 2015

  9. MASSACHUSETTS • Obstacles (con’t) • Citizen opposition, national attention • PR relations attacks • Challenging zoning, • Zoning approved, overturned • Appeal filed • Citizen appeal of state air permits • Administrative ruling: “No citizen standing” • Dept. head: “People must be heard” • Decision pending March 2012

  10. VERMONT • RPS • 20% by 2017 • Voluntary w/mandatory trigger • VPSB assessment, 2012 • Third party PPAs or build • Third-party “facilitator”

  11. VERMONT • Current status • 3 operating… 85MW • 0 closed • 0 new/under construction • 1 planned…29 MW • 1 terminated…29 MW

  12. VERMONT • Opportunity • H 56: Baseload renewable • Separate from RPS • Wood exclusive • Avoided cost • 25% renewable “consumption” • Separate from RPS • Farm, forest focus • FIT, <2.2 MW

  13. NEW HAMPSHIRE • RPS • 24% by 2025 • Class I new systems; 16% • Class II new solar; 0.3% • Class III existing methane, biomass; 6.5% • Class IV existing hydro; 1% • 3 yr. REC bank, 30% compliance limit

  14. NEW HAMPSHIRE • Current status • 8 operating…156 MW • 0 closed • 1 new/under construction…75 MW • 2 planned…40 MW • 0 terminated projects

  15. NEW HAMPSHIRE • Opportunity • Revised RPS: SB 218 • Class III generators • Remove methane, leave existing biomass • Cate Street 75-MW, Berlin • CHP, thermal, co-fire • Short-term contracts

  16. MAINE • RPS • 10% by 2017 mandatory, 40% target • < 100 MW eligible • 1% in 2008, + 1% annually • ACP: $61

  17. MAINE • Current status • 7 operating…268 MW • 4 closed…MW • 0 new/under construction • 3 planned…35 MW • 1 terminated…24 MW

  18. MAINE • Opportunity • LD 1706, HP 1258 • 3-year contracts, 5 existing IPPs • Energy, capacity & RECs • Market prices • Resale/wholesale • IPPs demonstrate jobs, economics • Utility: sell into wholesale markets

  19. MICHIGAN • RPS • 10% by 2015 • Energy efficiency • “Clean” energy • 2% in 2012, ramps up • Biomass exclusions • “Uncertified” whole trees • New MSW

  20. MICHIGAN • Current status • 6 operating…162 MW • 0 closed • 2 new/under construction…47 MW • 5 planned…133 MW • 5 terminated…497 MW

  21. MICHIGAN • Obstacles • No RPS modifications • Limit fuel availability • Opportunity • “25 x ‘25” ballot initiative, constitutional amendment • Forest- and ag-based rural development initiatives

  22. WASHINGTON • RPS • 15% by 2020 + conservation & efficiency • 3% by 2012 w/incr. increases • March 31, 1999 placed-in-service requirement • Biomass exclusions • Treated woods • Black liquor • Old growth fiber • MSW • ACP: $50 per MWH

  23. WASHINGTON • Current status • 6 operating…141 MW • 0 closed • 1 new/under construction…20 MW • 4 planned…116 MW • 2 terminated…60 MW

  24. WASHINGTON • Other: opportunity • SB 5575, passed Senate Feb. 14, 2012 • Removes place-in-service date • Expands biomass sources (BL, food wastes, yard wastes) • SB 5343 • CCA exemption for anaerobic digestion sources

  25. OREGON • RPS • By 2025… • Large…25% to “smallest”…5% • 8%...“small community” (<20 MW) • Unbundled RECs <20% • Jan. 1, 1995 placed-in-service date • Incremental new capacity eligible • Efficiencies • Biomass exclusions • Treated wood • MSW capped at 11 MW

  26. OREGON • Current status • 9 operating…130 MW • 0 closed • 0 new/under construction • 4 planned…140 MW • 1 terminated…24 MW

  27. OREGON • Opportunity • Biomass fuel tax credit • Biomass producers/collectors • Biofuel • Electricity • Anaerobic digestion, pellets, or torrefaction • Exclusions • Firewood, charcoal, C&D, urban wood, mill waste • Stand-alone power newly eligible

  28. OREGON • Biomass fuel tax credit (con’t) • Rates • $10/green ton…wood, ag residue • $5/green ton…yard debris • $0.90/bushel…grain crops

  29. OREGON • Biomass fuel tax credit (con’t) • Outcome* • Incr. availability… 20-30% • Reduced cost… 20% • Program specs. (per 10,000 BDT) • Cost:… $143,000 • Wages/bennies.. $241,000 • Jobs… 5.1 • Total economics… $868,000 *Source: Ecosystem Workforce Program report