100 likes | 275 Views
DIS Projects Report Hormoz Kazemzadeh. ABB Annual Users’ Group Meeting August 27 – 31, 2006. Network Manager DMS Projects. Network Manager Projects. ComEd Project Highlights Chicago Live as of 5/10 – Now Live System-Wide Large Single Database – 2.2M Nodes
E N D
DIS Projects ReportHormoz Kazemzadeh ABB Annual Users’ Group Meeting August 27 – 31, 2006
Network Manager Projects ComEd Project Highlights • Chicago Live as of 5/10 – Now Live System-Wide • Large Single Database – 2.2M Nodes • Use of CADOPS Remote in Regional Offices • Integration with ABB SCADA • CIM XML Based Interfaces • GIS CIM interface with SmallWorld GIS
Network Manager Projects CPS Energy Project Highlights • Parallel Implementation of GIS, Data Conversion, and OMS in Phase 1 • Going Live Next Month • ABB Prime for GIS Electric/Land/Gas, Data Conversion, OMS, GIS Design, and Mobile GIS • Integration between ABB Network Manager DMS, MDSI Advantex, and SAP • ICCP Interface to SCADA • netCADOPS Call Entry Screen Embedded in SAP • Network Analysis Applications for Phase 2 (Balanced Load Flow and Fault Location) • Plans for Notification and WebMap Modules
Network Manager Projects • APS Project Highlights • Phase 1 FAT Starting Next Month • TIBCO Based EAI • ICCP Interface to SCADA • AMI Integration • netCADOPS Call Entry Enhancements • Notification, WebMaps, and Crew Callout • Network Analysis Applications for Phase 2 (RSA, Unbalanced Load Flow, Fault Location, Simulation Mode, Auto-Schematic, Line Unloading, Capacitor Control Integration)
Network Manager Projects • DTE Project Highlights • FAT near completion • DTE implementing new ESRI GIS in parallel • Not implementing OMS at this point • Integration with ABB SCADA • Integration with Dispatcher Training Simulator • DMS applications (Unbalanced Power Flow, RSA, Line Unloading, Auto-schematic, Fault Location, Simulation Mode, Phase Angle Security Check, Dispatcher Training Simulator)
Network Manager Projects • Ergon Energy Project Highlights • ABB EMS/DMS Integrated system • DMS Pilot / No OMS at this point • Split Mode • SmallWorld GIS Interface • Jackson EMC Project Highlights • Tagging and Referral Enhancement • Going live in October • ESRI GIS interface • New Hampshire Electric Coop. Project Highlights • Starting October • ESRI GIS Interface • 4 Month Project
ABB Project Implementation Approach Define Scope Scope of Work (SOW) Program Development System (PDS) Initial Project Team Training Requirements Review Detail Requirements Software Task Spec. (STS) Configuration Guide As-Is/To-Be Workflows System Architecture Guide Develop System Code Development Test & Acceptance Plan Factory Acceptance Testing (FAT) Test Procedure (TPR) Deploy System Knowledge Transfer Site System Integration Site Acceptance Testing (SAT) Cutover/ Rollout
Business Process Change Management • Change Management Goals • User Acceptance • Realization of Benefits • Process Based Communication/Training/Support • Process Change Management • As-Is/To-Be Workflow • Gap Analysis / Impact Analysis • Communication, Training, & Support • Project Team / Core Team / SME’s • Super Users (Tier 1 Support) • End Users (Roles Based Security)