1 / 29

WELCOME

WELCOME. Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012. We would like to share with you. 1. About Pimpri Chinchwad City. 2. Institutional set up and key responsibility. 3. Information about BRTS projects. 4. BRTS system.

jess
Download Presentation

WELCOME

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012.

  2. We would like to share with you 1 About Pimpri Chinchwad City 2 Institutional set up and key responsibility 3 Information about BRTS projects 4 BRTS system

  3. About Pimpri Chinchwad City

  4. Located towards North of Pune Area of 181 sq. kms. Population: 1.7 million (approx) PCMC received “BEST CITY “ award 0n 13th December From GOI for its best performance in JnNURM Pimpri Chinchwad at a Glance • Area under Green Cover: 27% • AualBunndget (2012-2013): Rs. 2862Crs. • Credit Rating: AA+ (SO) by CRISIL Ratings (S&P)

  5. Vibrant city in the state of Maharashtra, India • Strong industrial base • Small & medium industrial units of about 6,000 • Large industrial units of about 50 • Auto and ancillary industrial Hub

  6. Presence of International IT Firms

  7. Social and recreational facilities • Strong Social Infrastructure with Municipal Hospitals and Dispensaries, Public Gardens, Libraries, Auditoriums, Play grounds etc. • Strong educational infrastructure including Municipal Schools, Medical, Engineering, IT and Management institutes.

  8. Population growth • The city has a population of about 1.7 millions growing over 7.2% p.a. (national average 2.1%) • Growth is fuelled by prospects of economic activity, good quality of infrastructure services and strong connectivity to the industrial capital of India i.e. Mumbai

  9. Urban Sprawl Patterns & Future Growth Scenario - 2031 Chakan New International Airport Talgaon Talwade IT Park Dehu Mumbai-Pune Exp Way Hinjewadi IT Park Pune City NOTE: MAP NOT TO SCALE Projected Population for PCMC 29 lakhs (CDP) in 2031

  10. Institutional Set-up Key Responsibilities

  11. Institutional set up • Pimpri – Chinchwad Municipal Corporation (PCMC) constituted in the year 1982 • The body constitutes of • Elected wing headed by – Mayor • Administrative wing headed by – Municipal Commissioner • We manage about 181 sq.kms of area through 4 Ward offices • We have over 40 departments with a workforce of about 7500 employees

  12. Institutional set up • We are fully e-governed Corporation • We have received International Organization of Standard (ISO) Certification (ISO 9001:2008) for Quality Management System in March 2012.

  13. Responsible for • Area planning • Infrastructure planning, implementation and operation & maintenance of services in the areas of • Water Supply, • Sewerage and Sanitation, • Solid Waste Management, • Roads and Transportation, • Street lighting, • Health and recreational facilities, • Education (134 primary and 18 secondary schools) • Preservation of natural heritage (river conservation), • Development of housing facility for urban poor/ slums.

  14. Vision To make Pimpri Chinchwad, a city of and for the next generation Economically vibrant, attracting top business houses And to meet the requirements of all its citizens A city to Live, Spend and Entertain

  15. Key initiatives taken Project Cost (` in Millions) Infrastructure Projects • Promoting development • Corridor densification along Bus Rapid Transit System (BRTS), leveraging TDR • Providing infrastructure ahead of its time • Implementing Rs. 26000 Millions projects sanctioned by JNNURM • Providing water security • Investments in sanitation and waste management • Making the city slum free • Slum rehabilitation and EWS housing to provide 32,000 houses • E Initiatives for better governance • Wi fi city • GIS based dynamic administration Water Supply 4987 Sewerage 2401 Solid waste management 704 BRTS & purchase of city transport buses 8032 Housing for slums 8631 Storm water drainage 1163 E-governance 92 Total 26000

  16. PROJECTS EXECUTED Pune – Mumbai Road Grade Separator at Pimpri Subway at Vallabhnagar Intersection at Finolex Pimpri

  17. INFORMATION OF BRTS PROJECT

  18. BRTS PROJECTS IN PCMC AREA Total BRTS Corridor Length = 44.575 Km. AUNDH RAWET ROAD Length = 14.50 Km. Tender Cost =191.40 PUNE MUMBAI ROAD Length = 11.90 Km. Tender Cost =120.74 KALEWADI ROAD Length = 10.275 Km. Tender Cost =219.20 Second Intersection First Intersection NASHIK PHATA ROAD Length = 7.90 Km. Tender Cost =206.80

  19. BRTS Phase- I Corridors • OLD MUMBAI PUNE CORRIDOR (DAPODI TO BHAKTI SHAKTI) – 12 KM • AUNDH – RAVET – 14.5 KM • NASHIK PHATA – WAKAD – 8 KM • KALEWADI PHATA – DEHU ROAD – 10.5 KM • Total Length = 45 km

  20. Construction of Flyover & ROB at Nashik Junction on old Mumbai Pune NH-4 including Bridge on River Pawana

  21. BRT SYSTEM

  22. Cross Section of 45 m Wide BRTS Road

  23. Bus Rapid Transit Bus Stations • Principal elements for consideration • Convenient boarding and alighting • Efficient fare collection • Comfortable and attractive stations • Easy safe signalized/dedicated approaches to Bus Stations • Modal integration • Excellence in customer service

  24. Conceptual Layout BRTS STATIONS -60.0 X 4.0 M SIZE FOR BOTH SIDE DOCKING

  25. “Think Railway Stations, Use Bus Stations!” BRT Bus Stations can give the same quality of service as Metro/Railway Stations to a large number of citizens across the city.

  26. Hybrid BRT ! – On & Off the Corridor RIGHT SIDE LEVEL BOARDING ON THE CORRIDOR LIKE METRO RAIL LEFT SIDE STEPPED BOARDING OFF THE CORRIDOR ( OUTSIDE BRT CORRIDOR)

  27. BRT station side entry from right side door

  28. BUS STATION DESIGN AND COMPONENTS

  29. Thank you PCMC, PIMPRI, PUNE

More Related