An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. new airportin dnepropetrovsk city

  2. We intend to clarify main problems tomaintain and expand the existing airport…

  3. …and benefits of building the NEWone…

  4. The expansion of Ukrainian main airports

  5. GATE CAPACITY OF UKRAINIAN AIRPORT’S after 2012

  6. Kyiv Lvov Kharkov Modernization of Ukrainian airports Odessa Donetsk

  7. DNEPROPETROVSK?

  8. Resent Terminal can operate only 800 000 passengers annually 5-8 million passengers per year 800 000 passengers per year Dnipropetrovsk European city

  9. ONLY FEW CONSTANT AND SEASONAL DESTINATIONS…

  10. PROBLEMS OF EXISTING AIRPORT 1. Limited space for potential development of the Terminal building 2. Airport is situated too close to the residential area 3. Taxiways for aircraft are long and not convenient 4. Runway is too short

  11. Runway orientation does correspond with prevailing wind orientation

  12. The expansion of existing airport will transform previously Centralized to De-centralized organization of the Terminal

  13. Oslo INTERNATIONAL EXPERIENCE. CENTRALIZED CONFIGURATION OF THE TERMINAL BUILDING Beijing Queen Alia

  14. hj The site for New airport Dnepropetrovsk 30 km Solene 30 km Zaporozhe • 2 runways will • accept all aircraft types • the site will not be • constrained from future • expansion • New airport will be situated in 30 km from both Dnepropetrovsk and Zaporozhe cities • It will have 2 runways for all types of aircrafts • New Terminal will have 2 levels of transport approach for departures and arrivals • New airport will meet all international licensing standards • new terminal building will • meet European standards

  15. We will avoid transportation problems on the road to the Terminal We will reduce the time needed to operate passengers We will create a sufficient circulation and concourse area…

  16. New TerminalBuilding • will provide high level of service to travelers • will have an attractive architectural look • will become a symbol of our region

  17. Thank you for your attention!