440 likes | 1.23k Views
Manufacturing & Quality Improvement Action Plan. Date: 13Dec05. Manufacturing & Quality Control Issues. Balance shaft taper inspection results Attachment 1.1. 1.386. 1.517. Balance shaft Cylindricity inspection results Attachment 1.2. Cpk:1.54. Cpk:1.43. 1.386.
E N D
Manufacturing &Quality Improvement Action Plan Date: 13Dec05
Balance shaft taper inspection results Attachment 1.1 1.386 1.517
Balance shaft Cylindricity inspection resultsAttachment 1.2 Cpk:1.54 Cpk:1.43 1.386 1.517 Based on Specification of 0.005 Cylindricity
BS Housing Bore Inspection results Attachment 2 1.386 1.517 Data Collection:Dec.05.05~Dec.10.05
BSM Balance shaft bearing Attachment 3.1 Bearing crush height Capability Study 0.070 0.054 1.517
BSM Balance shaft bearing Attachment 3.2 ●Measuring Machine – Crush Height Crush Height Value Display Load Value Display 1.386 1.517 Measuring Machine Picture Data Display Measuring Block
BSM Balance shaft bearing Attachment 3.3 ●GAGE R&R 1.386 1.517
Supplier Process Audit Schedule Attachment 4.1