Delta Design Schedule 1. Design Team Meeting ~ 10’ Assemble team, Assign Roles (Architect, Project Manager, Structural Engineer, Thermal Engineer) 2. Skill Development – Meet with your “expert” group – Review role and plan ~40’ (Architects start initial design after ~20’)
E N D
Delta Design Schedule 1. Design Team Meeting ~ 10’ Assemble team, Assign Roles (Architect, Project Manager, Structural Engineer, Thermal Engineer) 2. Skill Development – Meet with your “expert” group – Review role and plan ~40’ (Architects start initial design after ~20’) 3. Designing – Work together (all 4 roles) to create the “best” design ~60’ 4. Design Review – Each group presents their design including technical specifications – 5’/team ~40’ 5. Discussion