Summer Co-op Experience: OPG. Aditi Garg. Darlington Nuclear G.S. Located in Bowmanville, ON. About the plant. 4-unit station with a total output of 3,524 megawatts (MW) 20 per cent of Ontario’s electricity Tritium Removal Facility extracts tritium from heavy water.

jlabombard
Download Presentation

Summer Co-op Experience: OPG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summer Co-op Experience: OPG Aditi Garg

  2. Darlington Nuclear G.S Located in Bowmanville, ON

  3. About the plant • 4-unit station with a total output of 3,524 megawatts (MW) • 20 per cent of Ontario’s electricity • Tritium Removal Facility • extracts tritium from heavy water

  4. COMPONENTS AND EQUIPMENT • Electrical and I&C • Major Components • Mech & Rotating Equipment • Valves

  5. Major Components • Fans • Compressors • Pumps • Steam Generators (Boilers) • Feeders • Reactor Maintenance

  6. Inside the plant… Main Boiler Feed Pump Turbine Hall

  7. Projects • Critical equipment and Critical spares List • Root cause analysis of the seal failure • Transient monitoring for Feeders • Plant walk-down

  8. Transient monitoring for Feeders • CNSC Keep track of transient events that have occurred in each unit. • For all nuclear class system piping • Plant Information System (PI) • Temperature, pressure, %Power, etc. for all planned and forced outages

  9. Feeder thinning • reduction in pipe wall thickness of the outletfeeders • High pH dissolves pipes; reduces thickness • The cause of feeder thinning is flow accelerated corrosion (FAC). • poor design defects, poor chemistry controls and high temperature and pressure.

  10. Face of the CANDU reactor The face of a CANDU reactor (under construction).Some feeder pipes can be seen to the right of the reactor face.

  11. Flow Accelerated Corrosion (FAC) • motion of a corrosive fluid and a metal surface. • Outlet feeders • Dissolution of magnetite (Fe3O4) • Affects carbon steel components • High flow and specific water chemistry conditions. • Resulted in excessive thinning and failure of feedwater lines

  12. Reduce thinning • Outlet feeders • Injected by Titanium Dioxide • Uniform coating inside pipe to reduce thickness • Fe3O4  Dissolves with high temperature and pressure (pH >10.6) • Chemistry: pH 10.1- 10.4  rate of solubility is low

  13. Feeder Integrity Project • The Project is actively pursuingmeans to: • Extend the life of the feeders • Developing tooling for eventualfeeder replacement • Further developing pipe inspection techniques

  14. Root Cause Evaluation • Second Stage Reheat Pumps • Seal temperature was high above the alarm set point • Perform a failure modes analysis of the historical seal failures • Review modification packages and make changes to design • Identify technical and human performance related root cause

  15. Thank you!!