An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy Law 1 – Hydro Power Fall 2014 Sep 2, 2014 Alan Palmiter Not for distribution- for study purposes only

  2. Schedule Topic Date Special participants 1 – Hydro Sep 02 Santiago, Alison, Peter 2 – Coal Sep 09 Cam, Jeb 3  - Domestic Oil Sep 16 Andrew, Jeb, Samantha 4 – Intl Petroleum Sep 23 Cam, Andrew, Samantha 5 – Natural Gas Sep 30 Kees, Shaun, Hunter 6 – Nuclear Oct 07 Santiago, Hunter, Alison, Peter 7 – Renewables Oct 14 Kees, Shaun, Hunter 8 – Electricity Oct 21 Kees, Cam, Andrew 9 – Transportation Nov 11 Alison, Jeb, Samantha 10 – Cons/Efficiency Nov 18 Santiago, Shaun, Peter Visit – Henry Campen ??? Student presentations Nov 25 First-come, first-served Student presentations Dec 02 First-come, first-served * No classes Oct 28 and Nov 04

  3. Topic roadmap 1. Hydropower in energy mix • Compared to other sources (including renewables) • History of hydropower • Future of hydropower / hydrokinetic power 2. How hydropower works • Look inside dam • Pros / cons of hydropower 3. Regulation of hydropower • FERC licensing • Interested parties 4. Future of hydropower • Types of hydrokinetic power • Regulation of hydrokinetic projects

  4. 1 http://www.eia.gov/totalenergy/

  5. Energy Sources http://www.eia.gov/totalenergy/data/annual/perspectives.cfm

  6. Avg US utility customer = 10.8 Mwh / year Total electricity used by residential sector = 1,375 Mwh / year

  7. Energy production and use by state

  8. North Carolina

  9. 2. How hydropower works Click for video

  10. Itaipú, Brazil – world’s largest hydroelectric power plant • In 2000, the power plant generated 93 MM MWHs • 20% of Brazil’s power supply in Brazil / 94%ofParaguay’s • 7,919 meters long, max height 196 meters (65-stories) • Generates more than the Three Gorges Dam (China).

  11. Largest in the U.S. is the Grand Coulee Dam • Columbia River in Washington state. • Average power generation = 21 MM MWHs per year • Construction began in 1933, completed in 1942

  12. Pros and cons Pros: • Reduce greenhouse gas emissions • Cheaper to operate (after initial costs; no fuel costs; low maintenance) • Stable generation source (compared to other renewables) • Ancillary benefits (i.e. flood control and irrigation) Cons: • Environmental impact: dams affect natural river systems, fish and wildlife • Dams affect/destroy communities • Interferes with navigation on water ways • GHG emissions: methane from vegetation, as well as CO2 from cement “Let It Be” video on hydro dams Prof Mark T Brown

  13. Klamath River Restoration Project

  14. 3. How hydropower is regulated

  15. Water mills • History • Water rights • Common law • Mill Acts • Compensate landowners • Exclusive compensation (annual payments) • Private right of taking • Constitutionality?

  16. True or false? Hydro power is the largest source of renewable energy in the United States, accounting for about 35% renewable energy and 8% of electric power generation. Which is false – Water power was a main source of energy in the US Industrial Revolution States set up compensation schemes for property owners affected by dams Common law remedies in water rights cases were uniformly displaced Which is false -- Most hydropower projects are privately owned (though federally licensed) The largest US dams are federally owned and operated Federal agencies must get FERC license to operate hydro plant FERC has post-license power to order removal of dam 4. True or false? States do not license hydropower projects; their only role is to provide financing to municipal hydro projects. See Iowa Hydro-Electric Coop v. FPC(US 1946). Pop Quiz Hydro Power Answers: 1-T (2011) / 2-C (Fiske) / 3-C (Act) / 4-F

  17. Federal hydro regulatory - timeline Federal Energy Regulatory Comm’n & Dep’t of Energy (1977) Udall v. FPC (US 1967) Bonneville Power Administration (1937) Tennessee Valley Authority (1933) National Environmental Policy Act (1968) Endangered Species Act / Clean Water Act (1973) Electric Consumer Protection Act (1986) FPA Amendments (1935) Public Utility Regulatory Policy Act (1982) Federal Power Comm’n (1920 / 1930) Energy Security Act (1980) Federal Power Act (1920) National Power Policy (FDR 1934) Hydropower Regulatory Efficiency Act (2013) 1920 1940 1980 2000 2020

  18. FERC hydro licensing FERC jurisdiction? Preliminary permit? State CWA certification? • Issue • license? • Comp Plan? • Water power? • EIS? • Public uses? Retire hydro project? PURPA exemption? Judicial review? Integrated licensing?

  19. 4. Future of hydropower … Click for video

  20. Federal hydrokinetic regulation - timeline Federal Energy Regulatory Comm’n & Dep’t of Energy (1977) Udall v. FPC (US 1967) Energy Policy Act (2005) Dept of Interior Rule xxx (2009) National Historic Preservation Act (1966) Electric Consumer Protection Act (1986) National Environmental Policy Act (1968) Endangered Species Act / Clean Water Act (1973) FPA Amendments (1935) Public Utility Regulatory Policy Act (1982) Federal Power Comm’n (1920 / 1930) Energy Security Act (1980) National Power Policy (FDR 1934) Federal Power Act (1920) Hydropower Regulatory Efficiency Act (2013) 1920 1940 1980 2000 2020

  21. True or false? Conventional hydro power relies on diverting water flows, while hydrokinetic power relies on natural water flows. Which is true – Hydrokinetic power, like wind power, is variable and far from population centers FERC does not see a future for hydrokinetic power Hydrokinetic projects are underway in Puget Sound Hydrokinetic projects are underway in Europe Which is false -- Hydrokinetic projects, like conventional hydro projects, must be licensed by FERC FERC has jurisdiction over hydrokinetic projects on the OCS because on “navigable waters” Hydrokinetic projects on the OCS must be licensed by the Department of the Interior Hydrokinetic projects on the OCS must lease from the federal government (Dept of Interior) 4. True or false? States have licensing authority over hydrokinetic projects on their shores, before the OCS. Pop Quiz Hydrokinetic Power Answers: 1-T / 2-D (Portugal) / 3-C (lease) / 4-F (FPA)

  22. Energy federalism

  23. Hypothetical 17 USC S 767 (e) Issue of licenses for construction, etc., of dams, conduits, reservoirs, etc. To issue licenses to citizens of the United States, or to any association of such citizens, or to any corporation organized under the laws of the United States or any State thereof, or to any State or municipality for the purpose of constructing, operating, and maintaining dams, water conduits, reservoirs, power houses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, or upon any part of the public lands and reservations of the United States (including the Territories), or for the purpose of utilizing the surplus water or water power from any Government dam, except as herein provided: Provided, That licenses shall be issued within any reservation only after a finding by the Commission that the license will not interfere or be inconsistent with the purpose for which such reservation was created or acquired, and shall be subject to and contain such conditions as the Secretary of the department under whose supervision such reservation falls shall deem necessary for the adequate protection and utilization of such reservation: The license applicant and any party to the proceeding shall be entitled to a determination on the record, after opportunity for an agency trial-type hearing of no more than 90 days, on any disputed issues of material fact with respect to such conditions. All disputed issues of material fact raised by any party shall be determined in a single trial-type hearing to be conducted by the relevant resource agency in accordance with the regulations promulgated under this subsection and within the time frame established by the Commission for each license proceeding. Within 90 days of August 8, 2005, the Secretaries of the Interior, Commerce, and Agriculture shall establish jointly, by rule, the procedures for such expedited trial-type hearing, including the opportunity to undertake discovery and cross-examine witnesses, in consultation with the Federal Energy Regulatory Commission. Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting the navigation have been approved by the Chief of Engineers and the Secretary of the Army. Whenever the contemplated improvement is, in the judgment of the Commission, desirable and justified in the public interest for the purpose of improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, a finding to that effect shall be made by the Commission and shall become a part of the records of the Commission: Provided further, That in case the Commission shall find that any Government dam may be advantageously used by the United States for public purposes in addition to navigation, no license therefor shall be issued until two years after it shall have reported to Congress the facts and conditions relating thereto, except that this provision shall not apply to any Government dam constructed prior to June 10, 1920: And provided further, That upon the filing of any application for a license which has not been preceded by a preliminary permit under subsection (f) of this section, notice shall be given and published as required by the proviso of said subsection. In deciding whether to issue any license under this subchapter for any project, the Commission, in addition to the power and development purposes for which licenses are issued, shall give equal consideration to the purposes of energy conservation, the protection, mitigation of damage to, and enhancement of, fish and wildlife (including related spawning grounds and habitat), the protection of recreational opportunities, and the preservation of other aspects of environmental quality. Municipal Water has an old FPA hydro license for its dam on the Placid River that is about to expire. It applies to FERC for a new license. Group #1: You represent Sierra Club, which wants the dam torn down Group #2: You represent Development League, which wants the dam relicensed Group #3: You represent State Conservation Dept, which wants new conditions added to license Make your arguments …