1 / 4

Spray Pond Chemical Delivery System Redesign

Spray Pond Chemical Delivery System Redesign. PFC Distributor: Customer: IPT APS Palo Verde Tempe, AZ Nuclear Generating Station Phoenix, AZ. Application Details. Redesign of chemical delivery system in compliance with the Nuclear Regulatory Commission requirements Injection of:

johncox
Download Presentation

Spray Pond Chemical Delivery System Redesign

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spray PondChemical Delivery System Redesign PFC Distributor: Customer: IPT APS Palo Verde Tempe, AZ Nuclear Generating Station Phoenix, AZ

  2. Application Details • Redesign of chemical delivery system in compliance with the Nuclear Regulatory Commission requirements • Injection of: Tolytriozole (TTA) Phosphoric Acid Zinc Oxide Sulfuric Acid Sodium Hypochlorite • 3 Reactor Units, 2 Spray Ponds per Unit (6M Gal/Pond) • 15 Duplex ProMus Skids Replacing Stick Built Non- Functional Pulsa-Feeder & Milton Roy Pumps

  3. Problems / Opportunities

  4. The successful ProMinent solution… • ProMinent Duplex ProMus Skids. • Customer’s confidence was gained by: • IPT taking complete project responsibility including design, engineering, all equipment supply including meter pump skids, tanks, centrifugal pump skids, automated valves and lined pipe. • As a result… • We were able to satisfy the NRC mandate/requirement & thereby help APS to continue producing power. • We have been retained to resolve their Hydrazine pumping problems. • We hope to gain opportunity to replace their existing chemical metering pumps in their water treatment plant with ProMinent.

More Related