310 likes | 327 Views
Jennifer Livingston, ADOT Senior Project Manager, shares important information about the Design-Build Construction impacts to traffic and the maintenance of traffic. Stay informed through construction alerts, newsletters, and a dedicated hotline. Explore the benefits and considerations of the public information campaign, lane rental, variable message signs, highway conditions and reporting system, travel time system, and motorist assist patrol.
E N D
Jennifer Livingston, P.E. ADOT – Senior Project Manager Work Zone Operational Enhancements
Important corridor for Mohave County Commuter route Strong political support 24-hour consistent traffic count State Route 68 Design-Build
Web page Construction alerts Speakers bureau Placemats Brochures Public Information Campaign • Project Update Newsletters • Hotline • Media coordination
Public Information CampaignBenefits • Open lines of communication • Improved agency image • Increased customer awareness • Medium and audience flexibility
Public Information CampaignConsiderations • Financial • Perception • Commitment • Support • Proactive
Lane RentalBenefits • Accountability • Respecting our customers • Motivates the contractor • Creates teamwork
Lane RentalConsiderations • Financial • Application • Change in status quo
Variable Message SignsBenefits • Reaching target audience • Immediate and accurate information • Provides motorist with options
Variable Message SignsConsiderations • System maintenance • Support • Technology • Financial • Application • Limitations Planned VMS in AZ
HCRS (Highway Conditions and Reporting System) www.dot.state.az.us www.azfms.com/HCRS/arizona.html
HCRS - Highway Conditions and Reporting SystemBenefits • Communication tool • Accurate and timely information • Daily utilization • Agency support • Statewide consistency
HCRS - Highway Conditions and Reporting SystemConsiderations • Support • System maintenance • Technology • Financial • Application
SR 68 Travel Time System Camera at MP 15 Camera at MP 2
SR 68 Design-Build Travel Time System Golden Valley One set of CCTV’s at MP 12 MICROWAVE One set of CCTV’s at MP 2 Bullhead City Construction Office Video images from the two sets of CCTV’s are received by the computer. Travel Time is computed for each 10-minute interval. Video imaging system and tag recognition provided by Computer Recognition Systems Tel: 617-491-7665 Contact: Donald Wade or Salvatore D’Agostino
Travel Time System Benefits • Contractor commitment • Accountability • Incentives/ disincentives work
Travel Time System Considerations • Application • System security • Perception • Support • Financial • Technology
Measuring the MAP Program Incidents 963 Avg wait time 14 min Avg rating 4.8/5 scale
Resource Department of Public Safety ADOT Team Partnership with Private Sector Customer satisfaction Review incident prior to deploying ADOT or DPS staff Responsiveness Communication Image of ADOT Motorist Assist PatrolBenefits
Service vs. system improvements Personnel selection Financial Liability Perception Motorist Assist PatrolConsiderations
APPLICATIONS Public Information Campaign • Lane Rental • VMS • HCRS • Travel Time System • MAP
Jennifer Livingston, P.E. ADOT – Senior Project Manager Work Zone Operational Enhancements