1 / 9

Project X Working Group Meeting

Project X Working Group Meeting. September 30, 2010 10:00 – 11:30 AM Racetrack. Agenda. News/Status [Steve Holmes] Status of ICD-2 [ Sergei Nagaitsev] Preparations for CD-0 [Dean Hoffer] Next Meeting Action Items. Preparing for CD-0. CD-1 for past projects is now the new CD-0

jovita
Download Presentation

Project X Working Group Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project X Working Group Meeting September 30, 2010 10:00 – 11:30 AM Racetrack

  2. Agenda • News/Status [Steve Holmes] • Status of ICD-2 [Sergei Nagaitsev] • Preparations for CD-0 [Dean Hoffer] • Next Meeting • Action Items 30-Sep-2010 Project X WGM

  3. Preparing for CD-0 CD-1 for past projects is now the new CD-0 • Need a well developed Work Breakdown Structure (WBS) and a mature WBS Dictionary • Needed to establish structure and chargeable task codes (CTC) in Project Accounting (TPC tracking starts at CD-0) • Needed to establish schedule to get to CD-1 • Create and Maintain Key Assumption Document (Cost, Schedule, Technical and Programmatic) • Core Project Staff Assigned and Staffing Plan developed for bringing on the additional staff 30-Sep-2010 Project X WGM

  4. WBS, Control Accounts, and Chargeable Task Codes • Control Account (CA) – Intersection between the WBS and OBS where variance analysis will be preformed and VARs generated if thresholds are triggered. • Charge Task Code (CTC) – Is the level that actual cost are collected • Task in Fermi’s financial system (Oracle PA) • Task that Fermi people charge their time in Kronos. • Only one type of funding per CTC (i.e. OPC, PED, Line Item, …) • Separate CTCs for each contract • Separate CTCs for same work being done at separate locations/institution 30-Sep-2010 Project X WGM

  5. CA/CTC Examples 30-Sep-2010 Project X WGM

  6. CA/CTC Examples (continued) 30-Sep-2010 Project X WGM

  7. Project Staffing (Potential Positions/Responsibilities) • Project Manager • Deputy Project Manager • Subproject Technical Managers (i.e. Level 2) • Subproject Technical Leads (i.e. Level 3) • Project Controls (Schedule and EVMS) • Project Budget Manager/ Specialist Senior/ Specialist • Project Engineers (Mechanical, Electrical/ Electronics, Civil) • System Integration Engineer • Project Procurement Administrator/Specialist • Project ES&H • Project Administration • Control Account Mangers (CAMs) • Project Integration Manager • Project Risk Manager • Project Configuration Manager • Project Quality Manager • NEPA Coordinator • Project Webmaster • Project Database Manager 30-Sep-2010 Project X WGM

  8. Next Meeting • Next regularly scheduled meeting would be Thursday,21-Oct. Meeting will need to be reschedule. 30-Sep-2010 Project X WGM

  9. Action Items 30-Sep-2010 Project X WGM

More Related