1 / 16

Sistem Perhitungan Biaya Berdasarkan Pesanan

Sistem Perhitungan Biaya Berdasarkan Pesanan. Bab 5. Sistem Perhitungan Biaya Berdasarkan Pesanan ( Job Order Costing). Job Order Costing. Process Order Costing. Biaya diakumulasi untuk suatu operasi atau subdivisi dari suatu perusahaan.

joy
Download Presentation

Sistem Perhitungan Biaya Berdasarkan Pesanan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SistemPerhitunganBiayaBerdasarkanPesanan Bab 5

  2. SistemPerhitunganBiayaBerdasarkanPesanan ( Job Order Costing) Job Order Costing Process Order Costing Biayadiakumulasiuntuksuatuoperasiatausubdivisidarisuatuperusahaan. • Biayaproduksidiakumulasikanuntuksetiappesananygterpisah.

  3. SistemPerhitunganBiayaBerdasarkanPesanan • Pesananharusdiidentifikasisecaraterpisah. • Rincianmengenaisuatupesanandicatatdalamkartubiayapesanan. • Job Order Costing mengakumulasikanbiayabahanbakulangsung, tenagakerjalangsung, dan overhead yang dibebankankesetiappesanan.

  4. TigabagianygsalingberhubungandalamJob Order Costing: • Akuntansibahanbaku • Akuntansitenagakerja • Akuntansi overhead DelapanTipeAyatJurnal: Proses = Pesanan

  5. AkuntansiBahan Baku • PembelianBahan Baku Rayburn Company menerimapengirimansenilai $ 25.000 untukbahanbakuygdibelitanggal 5 Januari: Bahan Baku $25.000 Utang Usaha $25.000 Utang Usaha Bahan Baku

  6. AkuntansiBahan Baku • PenggunaanBahan Baku Total bahanbakuygdimintaselamabulanJanuari $ 31.000, terdiriatas $2.510 untukpesanan no.5574, $24.070 untukpesanan no. 5575, $4.420 untukpesanan no.5576. BarangDalamProses $31.000 Bahan Baku $31.000 Utang Usaha Bahan Baku BarangDlmProses

  7. PenggunaanBahan Baku (lanjutan) Perlengkapansenilai $ 6.000 dikeluarkandarigudangselamabulanJanuari Pengendali Overhead Pabrik $ 6.000 Bahan Baku $6.000 Pengendali Overhead Pabrik Utang Usaha Bahan Baku BarangDlmProses

  8. AkuntansiTenagaKerja • Biayatenagakerjaygterjadi Bebangajipabriksebesar $31.000 dihitungdandicatatpadatanggal 31 JanuaridanakandibayarawalFebruari. Bebangaji $31.000 Gajimasihharusdibayar $31.000 Gajimasihharusdibayar Bebangaji

  9. AkuntansiTenagaKerja • Biayatenagakerjaygdidistribusikan • BarangdalamProses $27.000 • BebanGaji $27.000 • Pengendali Overhead Pabrik $4.000 • BebanGaji $4.000 Gajimasihharusdibayar Pengendali Overhead Pabrik Bebangaji BarangDlmProses

  10. AkuntansiBiaya Overhead PabrikDibebankan • Biaya Overhead PabrikAktual Rayburn menghitungpenyusutanpabriksebesar $4.929 danasuransipabrikygsudahjatuh tempo $516. Pengendali Overhead Pabrik $4.929 AkumulasiPenyusutan-Mesin $4.929 Pengendali Overhead Pabrik $516 AsuransiDibayar Di Muka $516

  11. EstimasiBiaya Overhead ygDialokasikan • Menentukan overhead ygakandibebankanlebihsulit: • Beberapabiaya overhead bersifattetap • Beberapabiaya overhead sifatnyatidakrutin / musiman • Biaya Overhead didistribusikankesemuapesanan jumlahygdibebankansesuaidenganproporsidarisuatuaktivitas. • Aktivitasygdipilih dasaralokasi overhead • Jumlahygdibebankankesuatupesanan overhead dibebankan

  12. Rayburn menentukan jam mesindan overhead pabrikygdianggarkanadalahsebesar 7.500 jam mesindan $ 300.000. Jumlah Overhead Pabrikygdibebankan: $300.000/7.500 jam = $ 40 / jam mesin. Overhead dibebankanuntukmasing-masingpesanan: • No. 5574  29,4 jam x $ 40 = $ 1.176 • No. 5575  250,6 jam x $ 40 = $ 10.024 • No. 5576  50 jam x $ 40 = $ 2.000 Total Overhead PabrikDibebankan = $13.200 BarangDalamProses $13.200 Overhead PabrikygDibebankan $13.200 Overhead PabrikygDibebankan $13.200 Pengendali Overhead Pabrik $13.200  JurnalPenutup

  13. Pengendali Overhead Pabrik Bahan Baku Bebangaji BarangDalamProses Overhead PabrikDibebankan AkumulasiPenyusutan - Mesin 15.445 So. 2.245 AsuransiDibayar Di Muka Overhead terlalurendahdibebankan

  14. AkuntansiuntukBarangJadidanProdukygDijual Rayburn menyelesaikanpesanan no. 5574 dan 5575. Pesanan 5574 langsungdikirimke Lawrenceville Construction Company padatanggal 18 Januari. Pesanan 5575 ditransferkebarangjadi. Piutang Usaha $7.860 Penjualan $7.860 HargaPokokPenjualan $5.254 BarangDalamProses$ 5.254 BarangJadi $56.926 BarangDalamProses $56.926

  15. BarangDlmProses PersediaanBahan Baku Langsung PesananDiselesaikan BarangJadi TenagaKerjaLangsung HPP Overhead PabrikDibebankan Pesananselesaidandijual

More Related